Mining Intelligence and News
Australia

Peak Downs Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (metallurgical)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
Production Start... Lock
Mine Life... Lock
SnapshotPeak Downs is one of five metallurgical coal mines in Queensland’s Bowen Basin. Peak Downs operation includes coal handling and preparation plant.

Peak Downs Continuation Project proposes the ongoing development of the existing Peak Downs Mine with extraction of additional coal reserves and extension of the mine life by up to approximately 93 years. The Project would be supported by the development of new supporting infrastructure and the relocation/realignment of existing regional infrastructure. The Project would provide continued employment of the existing Peak Downs Mine workforce.

Owners

SourceSource
CompanyInterestOwnershipInvestor's Info
BHP Group Ltd. 50 % Indirect
Mitsubishi Development Pty Ltd. 50 % Indirect
BHP Billiton Mitsubishi Alliance Pty Ltd. (operator) 100 % Direct
BHP Billiton Mitsubishi Alliance Pty Ltd (BMA) is owned 50:50 by BHP Group Ltd. and Mitsubishi Development Pty Ltd.

BMA operates Peak Downs coal mine.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The Peak Downs Mine is located over a section of the Moranbah Coal Measures sub-cropping beneath a thin horizon of residual sand, clay and sandy-clay soils within the Quaternary alluvium. The Moranbah Coal Measures dip to the east at 3 to 5 degrees and are comprised of sandstone, shale, mudstone and coal. The consolidated thickness of coal in the Moranbah Coal Measures ranges from 12 m to 24 m and consists of up to eight seams: from the basal Dysart Main and Upper seam plies to the shallower Q and R seams.

Moranbah Coal Measures of Late Permian age dipping at 2–12° to the east; up to eleven coal seams/major seam splits are present. They are the S, R, Q, P1, P2, Harrow Creek Upper and Lower, DysartK, Dysart Upper 1 and 2, and the Dysart Lower 2 seams. Mining is mainly confined to the Harrow Creek and Dysart seam sequences, which average 4–5m each in thickness.

Bituminous coal is mined from the Permian Moranbah Coal measures Products range from premium-quality, low-volatile, highvitrinite hard coking coal to medium-volatile hard coking coal, to weak coking coal and medium ash thermal coal as a secondary product.

The Peak Downs Continuation Project (Project) is located in the central part of the Bowen Basin. The Bowen Basin is the northern extension of the Permian age Sydney-Gunnedah Bowen Basin which contains fluvial and shallow marine sediments with extensive coal measures.

The Fair Hill formation containing the Fort Cooper Coal Measures overlays the Moranbah Coal Measures within the Project area. The Moranbah Coal Measures contain the key seams to be targeted by the Project (Dysart and Harrow Creek coal seams).

The Project area landscape can be described as moderately to gently undulating hills and plains. The soil types found within the northern part of the Project area can be described as grey self-mulching cracking clays, with the southern part of the Project area described as hard pedal yellow/mottled-yellow duplex soils.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024202320222021202020192018201720162015
Coal (metallurgical) kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe11,86612,70012,11010,06210,222
All production numbers are expressed as clean coal.

Operational metrics

Metrics20232022202120202019201820172016
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe20,016,342 t21,753,506 t21,516,076 t17,942,049 t
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe19,374,903 t20,989,857 t21,154,705 t18,029,898 t
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Sep 24, 2024
....................... Subscription required ....................... Subscription required Subscription required Sep 24, 2024
....................... Subscription required ....................... Subscription required Subscription required Sep 24, 2024
....................... Subscription required ....................... Subscription required Subscription required Sep 30, 2024

Total WorkforceYear
...... Subscription required 2023
...... Subscription required 2022

Aerial view:

Lock

- subscription is required.