Mining Intelligence and News
Brazil

Neves Project

Click for more information

Categories

Summary

Mine TypeOpen Pit
Study CompletedFeasibility
StagePermitting
Commodities
  • Lithium
  • Spodumene
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotThe recently completed Definitive Feasibility Study (DFS) for the Neves Project demonstrates exceptional project economics that position Atlas Lithium among the world’s most capital-efficient lithium developers.

Atlas Lithium has invested approximately US$30 million to acquire and transport the Neves Project’s newly fabricated dense media separation (DMS) plant to Brazil. The ready-to-assemble DMS processing facility is now stored in Brazil, pending on-site assembly.

The Neves Project has already received all permits needed to assemble the processing plant and operate.

Additionally, on May 27, 2025, the Neves Project received “Portaria de Lavra” (mining concession) status from Brazil’s Ministry of Mines and Energy—the highest level of mineral rights title in Brazil, allowing continuous mining operations.
Latest NewsAtlas Lithium Reports Excellent Exploration Progress at 100%-Owned Salinas Project     August 18, 2025

Owners

SourceSource
CompanyInterestOwnership
Atlas Lithium Corp. 100 % Indirect
Atlas Lítio Brasil Ltda. (ALBL), the Brazilian subsidiary of Atlas Lithium Corp., owns the mining rights to the Neves Lithium Project.

Contractors

Lock

- subscription is required.

Deposit type

  • Pegmatite

Summary:

Deposit Type
The mineral systems in highly evolved magmatic sources of REEs and lithium are controlled by the degree of fractionation. In granitic rocks with a high degree of fractionation, lithium and tantalum is more abundant. This characteristic defines the spatial zoning and distribution of pegmatite mineralogy with respect to the parent magma (pluton). The relationship between fractionation and REE concentration has not been determined in eastern Minas Gerais. Based on geochemical studies, Morteani et al. (2000) show that the pegmatites of the Araçuai-Itinga/orogen cover the complete fractionation interval exposed in the Eastern Brazilian Pegmatite Province (EBPP).

The Araçuaí-Itinga lithium pegmatites are controlled by structure which can be concordant or discordant with respect to schist foliation. The work of Sá (1977) shows that pegmatites discordant with schist foliation predominate, with strikes varying from 40° to 80° and high angle dips in the northeastern quadrant of the exploration area. The pegmatite bodies tend to be tabular with little variable thickness and are hosted in the schists of the Salinas Formation.

Local and Property Geology
In eastern Minas Gerais, lithium-rich pegmatite mineralization is hosted in metamorphosed Salinas Formation shales (cordierite-quartz-mica schist) and is either concordant or discordant with schist foliation. The pegmatites occur as tabular bodies with thicknesses from 2 m to 36 m. Laterally, mineralized bodies vary from 40 m to 350 m in length and are primarily made of quartz, alkali (K-) feldspar (perthitic microcline), albite, muscovite, spodumene, and petalite. Spodumene makes up approximately 20% of the mineralization, with K-feldspar and albite constituting approximately 35%, quartz approximately 35%, and muscovite less than 10%.

Schists of the Salinas Formation outcrop in the Neves exploration areas (ANM No. 833.331/2006, 832.925/2008, 833.356/2008, and 833.639/2003) which were intruded by magmatic suite G4 monzogranites of the Teixerinha batholith and pegmatites hosting lithium rich spodumene, columbite-tantalite, and gem quality tourmalines.

The exploration area is covered by a thick (five meter) horizon of sandy to silty soil brownish ochre in color, with blocks (<30 cm) of pegmatites from adjacent artisanal mines or displaced by heavy rainfall and steep relief. The Neves area is heavily vegetated which makes it difficult to identify outcrop, however, historical artisanal mining activity has exposed the deposits. For decades, the Neves exploration area has been developed for tourmaline resources and gems (spodumene, triphane, petalite, columbite-tantalite) at some farms within the mineral right. The artisanal mines are inactive today. Tailings from these mines were disposed of in piles or "dumps" scattered throughout the area, and in some places complicating access to outcrop.

Cordierite-quartz-mica schists of the Salinas Formation outcropping in the Neves exploration area are light gray to black in color, banded, and occasionally with quartzitic composition. The banding reflects variations in the proportions of biotite to muscovite (dark bands) and the sum of quartz and feldspar (light bands). These metamorphic rocks are in the green schist facies with foliations perpendicular to the strike which varies between N30°E and N50°E. High angle dips (45°-80°) have been observed in contact with intrusive igneous rocks. Syn-tectonic quartz veins are concordant with the schist foliation, exhibit local boudinage structure, and are one centimeter to 30 cm thick. The Salinas Formation schists host significant pegmatite bodies, ranging from 1 m to 2 m thick to 10 m to 30 m thick and up to 40 m to 450 m long.

Six mineralized pegmatite outerops have been mapped in the western portion of the Neves exploration property, that are 2 m to 29 m thick and up to 200 m long, where exposed at surface. The strike of the pegmatites is sub-parallel to oblique to schist foliation, locally homogeneous, and composed of quartz, feldspar, muscovite, black tourmaline, and locally spodumene and petalite. The spodumene and petalite occurs as altered white clay at surface and as phenocrysts disseminated throughout the host rock.

In the eastern portion of the property, several pegmatite bodies outcrop along the main drainages in schists of the Salinas Formation. The pegmatites follow a strike trend of N5°E to N30°E and are concordant with schist foliation.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnitsAvg. AnnualLOM
Spodumene kt 151951

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping ratio  ....  Subscribe
Tonnes processed  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
* According to 2025 study.

Production Costs

CommodityUnitsAverage
Cash costs Spodumene USD  ....  Subscribe
All-in sustaining costs (AISC) Spodumene USD  ....  Subscribe
Assumed price Spodumene USD  ....  Subscribe
* According to 2025 study / presentation.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
OP OpEx $M USD  ......  Subscribe
Processing OpEx $M USD 102
Freight costs $M USD 40
G&A costs $M USD 49
Total OpEx $M USD  ......  Subscribe
Income Taxes $M USD  ......  Subscribe
Royalty payments $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
Net revenue (LOM) $M USD  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 7% $M USD  ......  Subscribe
After-tax NPV @ 7% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 8, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 8, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 8, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 8, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 8, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 8, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 8, 2025

Workforce

Total WorkforceYear
...... Subscription required 2025

Aerial view:

Lock

- subscription is required.