Mining Intelligence and News
Australia

Rebecca-Roe Project

Click for more information

Categories

Summary

Mine TypeOpen Pit & Underground
Study CompletedFeasibility
StagePermitting
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
  • Longhole open stoping
Project Timeline... Lock
Mine Life... Lock
SnapshotThe Rebecca-Roe Project is an integrated mining operation that includes the Rebecca and Roe deposits. Mining activities will utilize a combination of open pit and underground methods, supported by the Rebecca processing plant.

Ramelius updated 2025 DFS for the Rebecca-Roe Gold Project expands reserves and the mine plan, upgrades infrastructure with a larger village and sealed airstrip, increases capital and operating costs, and defers processing plant construction to a later stage.

Rebecca-Roe is a key growth project for Ramelius going forward. Once operational, it will provide with a new mining hub in an under-explored mining region, which plan to take advantage of Ramelius proven huband-spoke model.

Key focus areas:
• Referral of Roe Project to Environmental Protection Authority (EPA);
• Completion of Native Title Mining Agreement and granting of associated tenure;
• Tendering of Early Works contracts such as the airstrip, mine village and borefields.
Latest NewsRamelius Resources Ltd.: Rebecca-Roe Gold Project Definitive Feasibility Study     October 28, 2025

Owners

SourceSource
CompanyInterestOwnership
Ramelius Resources Ltd. 100 % Indirect
The Rebecca and Roe tenements are held by wholly owned subsidiaries of Ramelius Resources Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Vein / narrow vein
  • Stratabound
  • Orogenic

Summary:

The Rebecca-Roe Gold Project comprises two distinct deposits: the Rebecca deposit and the Roe deposit, both project areas lie within the Shire of Kalgoorlie-Boulder and predominantly on the Yindi Pastoral Lease (Cowarna Downs Station).

Rebecca
Gold mineralisation along the Rebecca structural corridor extends over at least 1.8km strike and encompasses three major sub-parallel, moderate west dipping and north-south trending structures (Jennifer, Laura and Maddy). The lodes consist of disseminated sulphide/gold mineralisation within strongly foliated and locally silica altered and sheared gneiss up to 30m wide (true width), as well as multiple adjoining narrower stacked lodes of lower-grade mineralisation.

The geology at Rebecca features a folded sequence of gneiss, amphibolite and diorite. A 10m wide sub-vertical, NE-SW striking ultramafic dyke unit occurs in the northern half of Rebecca, cutting across the mineralisation.

The Duchess deposit occupies a broad area approximately 1.2km long and up to 900m wide, located approximately 4.5km south-west of Rebecca. The area is characterised by widespread sub-horizontal layers of mineralised material in the lower oxide profile, and multiple north trending and moderate west-dipping disseminated sulphide structures in underlying fresh granodiorite and micro-diorite gneiss.

The Duke deposit lies 1km to the south of Duchess in a north-west striking zone along the western limb of a project-wide fold. Mineralisation is steeply dipping and hosted in a single lode zone (10-25m wide), associated with moderate disseminated sulphides in weakly silicified felsic gneiss.

The Cleo deposit is located approximately 1.5km to the west of Rebecca. The local geology consists of a strongly folded sequence of diorites, amphibolites and metasediments that are cross-cut by steeply dipping (60-70°), narrow barren pegmatite veins. The main zone of mineralisation occurs as a broad (up to 30m wide), north trending, steeply west dipping (50-70°) lode within the diorite. There are a series of thinner (2-5m wide) north trending hanging wall and footwall lodes with westerly dips ranging from shallow to steep (25-65°).

The Duchess and Duke mineralised areas have local sub-cropping oxidised bedrock overlain by sandy and calcareous soils, while the 1.7km Rebecca mineralised corridor lies in an area of transported cover that is part of a local NE trending palaeo-drainage that trends diagonally from Duchess and into Lake Rebecca. Rebecca has up to 30m of transported cover on oxidised leached bedrock (saprolite), for a total 35-50m of unmineralised and/or depleted overlying material. The transported and oxide profile is generally unlithified below local hardpan caprock.

The Rebecca Project drill hole database is comprised of a combination of historic holes drilled by previous owners and recent RC and diamond drilling conducted by Ramelius. Drillholes at Rebecca are orientated orthogonal to the geological and mineralised trend. Intercept angles are often near perpendicular. Typically, as -60° east dipping holes drilling 40-50° west dipping lodes.

Roe
The greenstone geology of the Roe project area can be divided into the Yindi (Western) domain and the Edjudina (Eastern) domain. The Yindi Domain is centred around the ~60-70° Edipping Roe Shear Zone corridor. Lithology is dominated by mafic amphibolite, fine-to coarsegrained felsic-intermediate schists and turbiditic siltstone-shale.

The Edjudina domain is distinguished from the Yindi domain by major lithological, metamorphic and structural changes that occur across the interpreted western branch of the Claypan Shear Zone. A major lithological distinction is the presence of large volumes of high-Fe tholeiitic mafic rocks, mostly in the form of fractionated dolerite sills. The Bombora Sill is the largest of these bodies and hosts most of the gold mineralisation at Bombora. The main body of the Bombora Sill is 150-300m in true thickness at the centre of the project area, but magmatic and/or structural duplication creates a sill complex up to ~500m true thickness towards the southern end of the Resource area.

The Kopai-Crescent deposit is located approximately 2km to the north of Bombora on the northern extension of the eastern branch of the Claypan Shear Zone. The host rocks consist of an east-dipping package of mafic to intermediate volcanics, local metasediments and black shales, intruded by numerous, small bodies of dolerite (both fractionated and massive) and localised lamprophyres. The area is overlain by transported lake sediments which are typically 5 -10m thick. The weathering profile is generally shallow, with a stripped upper saprolite and a top of fresh rock surface located at ~35m depth.

Gold mineralisation at Bombora is largely stratabound, occurring preferentially in the ~150m thick, iron-rich granophyric quartz dolerite zone of the Bombora Sill over a 3km strike length. Mineralisation is hosted in three main lode orientations: (1) north-northwest-striking, sub-vertical steep lodes; (2) gently north- to northeast-dipping flat lodes and (3) moderately west-dipping west lodes.

The mineralisation in controlled in two ways:
• Lithological control: where structures intersect the competent, magnetite-rich quartz dolerite. Mineralisation occurs via the sulphidation process, with the dominant alteration assemblage identified as silica-albite-pyrrhotite. These shoots have a southern shoot plunge.

• Structural control: at the intersection of multiple structures. When the intersection involves a west-dipping structure the primary alteration assemblage of silica-albite-pyrrhotite is overprinted by carbonate-biotite-pyrite. This control gives a gentle north plunging orientation to the shoots, equivalent to the orientation of sigma two in the stress ellipsoid. This control is mainly observed in the quartz dolerite, where the structures are better developed, but is also observed outside of the quartz dolerite.

The Bombora deposit is totally concealed under a thin (5 to 15m) layer of transported cover developed within and peripheral to the Lake Roe Salt Lake system. The transported cover is dominated by lacustrine clays, overlain by aeolian sands and transported ferricrete adjacent to the lake footprint. The in-situ regolith profile is strongly stripped, with the upper saprolite rarely preserved in the deposit area.

The Roe database is comprised of a combination of historic RC and diamond drilling combined with recent drilling conducted by Ramelius. At Bombora, drill holes are on a nominal spacing of 40m x 20m with areas at a 20m x 20m spacing completed every 200 metres along strike in the shallow part of the Bombora resource to ~200-250 meters below surface). At Claypan, the drill spacing is on a nominal 200m x 80m reconnaissance pattern. At Kopai-Crescent, the drill spacing is on a nominal 100m x 40m with local infill to 40m x 20m in the southern (Crescent) area and within the Indicated Resource areas.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Water usage

Parameter2025
Groundwater 3 G l/year

Commodity Production

CommodityUnitsAvg. AnnualLOM
Gold koz 130 *1,086 *
All production numbers are expressed as metal in doré. * According to 2025 study.

Operational metrics

Metrics
Annual processing rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2025 study.

Production Costs

CommodityUnitsAverage
Total cash costs Gold AUD  ....  Subscribe
All-in sustaining costs (AISC) Gold AUD  ....  Subscribe
All-in costs Gold AUD  ....  Subscribe
Assumed price Gold AUD  ....  Subscribe
* According to 2025 study / presentation.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Sustaining CapEx $M AUD  ......  Subscribe
Total CapEx $M AUD  ......  Subscribe
OP OpEx $M AUD  ......  Subscribe
UG OpEx $M AUD  ......  Subscribe
Processing OpEx $M AUD 744
Transportation (haulage) costs $M AUD 116
G&A costs $M AUD 112
Total OpEx $M AUD  ......  Subscribe
Income Taxes $M AUD  ......  Subscribe
Royalty payments $M AUD  ......  Subscribe
Gross revenue (LOM) $M AUD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M AUD  ......  Subscribe
After-tax Cash Flow (LOM) $M AUD  ......  Subscribe
Pre-tax NPV @ 5% $M AUD  ......  Subscribe
After-tax NPV @ 5% $M AUD  ......  Subscribe
After-tax IRR, %  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 5, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 5, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 5, 2025

Workforce

Aerial view:

Lock

- subscription is required.