Mining Intelligence and News
India

Lingaraj Area Operation

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
  • Surface miner
Production Start... Lock
Mine Life... Lock
SnapshotLingaraj Area Operation includes only one mine - Lingaraj opencast mine, which is located on the Talcher coalfield in Angul district of Odisha state of India.

Lingaraj opencast mine has production capacity of 20 Mtpa of non-coking (thermal) coal.

Owners

SourceSource
CompanyInterestOwnership
Coal India Ltd. 100 % Indirect

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

Lingaraj opencast mine is located on the Talcher coalfield.

Talcher coalfield constitutes the south-eastern most part of the Lower Gondwana basins within the Mahanadi Valley graben bounded by Latitude 20°53' to 21°12' N and Longitude: 84°0' to 85°23'E. The major part of the coalfield including the present coal mining area falls in Angul district.

At the Lingaraj opencast mine, coal is being extracted from eight seams: Talcher II, Talcher III, Talcher IV-A, Talcher IV-B, Talcher V, Talcher VI-A, Talcher VI-B, Talcher VII.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Summary:

Production

CommodityUnits20232022202120202019
Coal (thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe14
All production numbers are expressed as ROM coal.

Operational metrics

Metrics20232022202120202019
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe13.6 Mt
Raw coal annual capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe12,037,619 m3

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailRef. Date
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Jun 26, 2024

Total WorkforceYear
...... Subscription required 2023

Aerial view:

Lock

- subscription is required.