Mining Intelligence and News
Australia

Donald Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • Zircon
  • Titanium
  • REE
  • Ilmenite
  • Monazite
  • Xenotime
  • Rutile
Mining Method
  • Truck & Shovel / Loader
  • Dry mining
Mine Life... Lock
SnapshotThe Donald Project comprises two adjoining deposits, the Donald deposit (which constitutes the area covered by MIN5532 and RL2002) and the Jackson deposit (RL2003). The Jackson deposit represents further potential mining and processing opportunities. The Donald Project will produce two products, a heavy mineral concentrate (HMC) and a rare earth element concentrate (REEC).

The mining licence MIN5532 is the site of Phase 1 of the Donald Project. It is envisioned that Phase 2 of the project will be developed on retention licence RL2002 with proposed operations to the north and south of MIN5532.

The Donald Project will form a part of the Joint Venture, in which Energy Fuels has the right to contract up to 100% of REEC production, and Astron has the right to contract up to 100% of the HM concentrate production.

REEC pricing based on Cost Insurance and Freight (CIF) USA provided as of February 2023. HMC pricing based on CIF China provided as of Q1 2023.

Owners

SourceSource
CompanyInterestOwnership
Energy Fuels Inc. 3.2 % Indirect
Astron Corporation Ltd. 96.8 % Indirect
Astron Corporation Limited holds Donald Project mineral tenements through its wholly owned subsidiary Donald Mineral Sands (DMS) Pty Limited.

Astron has executed binding agreements to form a Donald Project Pty Ltd (DPJV) with Energy Fuels (EFI) to develop the Donald Deposit. Under the Venture, Energy Fuels has the right to invest AUD$183 million to earn up to a 49% interest in the Venture. Energy Fuels JV funding has already commenced.

On 15 July 2024, the Earth Resource Regulator has advised that the transfer of the relevant Donald tenements from Donald Mineral Sands Pty Ltd (DMS) to DPJV has been approved.

At execution of the Agreement, Astron holds 100% of the shares in DPJV.

The interest-free loan of $8.6 million, provided by Energy Fuels to cover Donald’s development costs from June 4 to September 26, 2024 has been converted into an approximate 3.2 per cent equity in the joint venture.

Contractors

Lock

- subscription is required.

Deposit type

  • Mineral sands

Summary:

The Donald deposit is within the Murray Basin, which comprises flat-lying Cenozoic sediments that unconformably overlie Proterozoic and Palaeozoic basement rocks. The mineralisation is contained within the Tertiary aged Loxton Sand, a sequence of marine sands representing a range of environments including deep-water (offshore), near shore, tidal, beach and back dunal sediments.

The Wimmera Industrial Minerals (WIM)-style mineralisation, fine grained heavy mineral deposit within the Parilla Sand.

The Project contains significant rare earth minerals in the form of monazite and xenotime.

The deposit can be described as a Tertiary succession of freshwater, marine, coastal and continental sediments deposited heavy minerals in the area. The deposit consist of a solitary or composite broad, lobate sheet-like body of considerable aerial extent, highly sorted and associated with fine micaceous sand. These deposits are thought to represent accumulations formed below the active wave base in a near shore environment, possibly representing the submarine equivalent of the strand style deposits.

The mineralisation at Donald is contained within the marine sequence of the Loxton Sand. The marine sequence of the Loxton Sand unit can be subdivided into three sub-units:
• LP1 – fine to very coarse friable quartz sands and minor silty, clay and gravel beds representing dunal, foreshore and surf zone sediments;
• LP2 – near-shore, very fine silty micaceous quartz sands, minor clays and gravels, representing sediments deposited below the wave base that show friable laminated and truncated HM mineralised beds. LP2 is the principal fine-grained heavy mineral target throughout the Murray Basin and contains the majority of the mineralisation in the Donald deposit;
• LP3 – represents deep water sedimentation containing higher silt and clay material than LP2.

Within the Donald deposit area, the Loxton Sand is underlain by the Geera Clay. The Geera Clay typically consists of black, grey, green or yellow brown plastic clays, with minor silts and is interpreted to have formed in a shallow water, marginal marine, lagoonal or tidal flat environment.

The Loxton Sand is overlain by the fluvio-deltaic Shepparton Formation which consists of clay and silt.

Dimensions
The mineralization ranges in depth from 1 m to 41 m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityProductUnitsAvg. Annual
Heavy Minerals Concentrate kt 229
Zircon Mineral in concentrate t 42,500
Titanium Mineral in concentrate t 152,000
REE Concentrate kt 7.2

Operational metrics

Metrics
Hourly processing capacity  ....  Subscribe
Annual ore mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
* According to 2023 study.

Production Costs

Commodity production costs have not been reported.

Operating Costs

CurrencyAverage
OP mining costs ($/t mined) AUD  ....  Subscribe
Processing costs ($/t milled) AUD  ....  Subscribe
* According to 2023 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M AUD  ......  Subscribe
Sustaining CapEx $M AUD  ......  Subscribe
Total OpEx $M AUD  ......  Subscribe
Gross revenue (LOM) $M AUD  ......  Subscribe
EBITDA (LOM) $M AUD  ......  Subscribe
Pre-tax NPV @ 8% $M AUD  ......  Subscribe
After-tax NPV @ 8% $M AUD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jul 26, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 9, 2024

Aerial view:

Lock

- subscription is required.