Australia

NiWest Project

Click for more information

Categories

Summary

Mine TypeOpen Pit
Study CompletedFeasibility
StagePermitting
Commodities
  • Nickel
  • Cobalt
Mining Method
  • Truck & Shovel / Loader
Project Timeline... Lock
Mine Life... Lock
SnapshotNiWest contains one of Australia’s highest-grade undeveloped nickel laterite resources.

The project will establish itself as a sustainable, ethical producer of high-purity Class 1 nickel sulphate and cobalt sulphate, offering low-cost, battery-grade products with a minimal carbon footprint.

The NiWest Project incorporates seven separate mining areas within a 50 km radius of the proposed plant site at Mt Kilkenny and is in close proximity to critical open access infrastructure such as rail and gas lines and sealed arterial roads.

Alliance Nickel Ltd. has secured a five-year binding take-or-pay offtake agreement with Stellantis N.V., covering around 40% of annual production.

NiWest Project was awarded Major Project Status earlier this year by the Federal Government, which is testament to its economic potential, recognised at both state and national level. The Project has also been recognised internationally as a Minerals Security Partnership strategic project.

Owners

SourceSource
CompanyInterestOwnership
Alliance Nickel Ltd. 100 % Indirect
Alliance Nickel Ltd. owns 100% of the NiWest Project through its wholly owned subsidiary, NiWest Limited.

Contractors

Lock

- subscription is required.

Deposit type

  • Laterite

Summary:

NiWest contains one of the highest-grade undeveloped nickel laterite resources in Australia.

NiWest comprises Mt Kilkenny, Hepi, Wanbanna, and Eucalyptus deposits.
The NiWest deposits are all hosted within the Murrin Domain which, from the bottom up, consists of the following formations:
-Welcome Well Formation – andesitic conglomerate, sandstones, and siltstones intercalated with andesiticbasaltic lava flows.
- Minerie Formation – tholeiitic basalts intercalated with lesser amounts of turbiditic sediments and komatiitic basalts.
- Murrin Murrin Formation – ultramafic and komatiitic basalts intercalated with lesser amounts of clastic sedimentary beds (predominantly sandstone).
- Pig Well Formation – conglomerate and feldspathic sandstones.

Elevated nickel and cobalt concentrations occur in the regolith profile that has developed over the serpentinised peridotite cumulates of the Murrin Murrin Formation. The regolith layer, which is typically around 30 m thick, shows distinct grade and textural changes with depth. These changes have resulted from the intense weathering of the serpentinised peridotites. The serpentinised olivines are initially converted to magnesium-rich clays (saponites and chlorites), which in turn are converted to iron-rich, smectitic clays (nontronite), and then to goethite, hematite and kaolinite.

- The deposits in the project area are described as dry climate nickel laterites.
- Elevated nickel and cobalt concentrations occur within the lateritic cappings that formed from the prolonged weathering (serpentinization) of the Archaean ultramafic and komatiitic basalts of the Murrin Murrin Formation.
- The lateritic profile is typically 25 m thick and generally comprises a ferruginous zone, a smectitic clay zone and a saprolitic zone. The saprolitic zone transitions into saprock, and then into unweathered peridotites and dunites.
- Supergene and residual enrichment processes generally result in elevated nickel concentrations developing in the smectite zone and, to a lesser extent, in the saprolite and ferruginous zone. In general, the concentrations in the saprock are only slightly higher than those in the unweathered ultramafics. In many places, the lateritic profile is often covered by a thin layer of recent sediments. The cover is usually only a few metres thick, but can exceed over 50 m in places.

The approximate dimensions of the defined deposits and the average thicknesses of the deposits are summarised below:
1. Mt Kilkenny: Model extent: 8.5 × 0.7 km, Laterite thickness: 25 m, Overburden thickness: 12 m.
2. Hepi: Model extent: 2.4 × 0.5 km, Laterite thickness: 25 m, Overburden thickness: n.d. (not determined).
3. Wanbanna: Model extent: 2.0 × 0.5 km, Laterite thickness: 30 m, Overburden thickness: 16 m.
4. Eucalyptus: Model extent: 14.5 × 3.5 km, Laterite thickness: 35 m, Overburden thickness: n.d. (not determined).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. AnnualLOM
Nickel Metal in sulphate kt 20627
Nickel Sulphate kt 902,809
Cobalt Metal in sulphate kt 1.547
Cobalt Sulphate kt 7.7228

Operational metrics

Metrics
Annual production capacity  ....  Subscribe
Annual processing rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2024 study.

Production Costs

CommodityAverage
Credits (by-product) Nickel  ....  Subscribe
All-in sustaining costs (AISC) Nickel  ....  Subscribe
All-in sustaining costs (AISC) Nickel  ....  Subscribe
C1 cash costs Nickel  ....  Subscribe
Assumed price Cobalt  ....  Subscribe
Assumed price Nickel  ....  Subscribe
* According to 2024 study / presentation.
** Net of By-Product.

Operating Costs

CurrencyAverage
Processing costs ($/t milled) AUD  ....  Subscribe
G&A ($/t milled) AUD  ....  Subscribe
* According to 2024 study.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Sustaining CapEx $M AUD  ......  Subscribe
Closure costs $M AUD  ......  Subscribe
Gross revenue (LOM) $M AUD  ......  Subscribe
EBITDA (LOM) $M AUD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M AUD  ......  Subscribe
After-tax Cash Flow (LOM) $M AUD  ......  Subscribe
Pre-tax NPV @ 8% $M AUD  ......  Subscribe
After-tax NPV @ 8% $M AUD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Personnel

Mine Management

Job TitleNameEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jun 18, 2025
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Jun 13, 2025

Workforce

Total WorkforceYear
...... Subscription required 2024

Aerial view:

Lock

- subscription is required.