Mining Intelligence and News
Peru

Mina Justa Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Copper
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotMina Justa is an open-pit copper mine. Mina Justa operates two plants for mineral processing: the Sulphide Plant, which produces high-quality copper concentrate, and the Oxide Plant, which produces high-purity copper cathodes.

Alxar, a subsidiary of Empresas Copec, announced the Justa Subterránea project (underground mine), which will become the second largest mining initiative in the country. The project, set to begin production in 2027, will increase current reserves by 30%, adding more than 500 thousand tons of fine copper and extending the mine's useful life by 5 years. Minsur, a Peruvian miner, plans to invest at least $2 billion in five years to expand its copper and tin operations, including around $543 million in an underground project at the Justa mine.

Owners

SourceSource
CompanyInterestOwnership
Alxar Internacional SpA 40 % Indirect
Minsur S.A. (operator) 60 % Indirect
MINSUR S.A. through its subsidiary Cumbres Andinas S.A., owns 60% of the shares of Cumbres Andinas S.A.C., which owns 99% of Marcobre S.A.C. The latter, operates Mina Justa copper mine.

Contractors

Lock

- subscription is required.

Deposit type

  • IOCG

Summary:

The Project is located in the plain of the Central Coast of Peru. The region is located east of one of the most active plate borders, that is part of the Ring of Fire, and where a large number of destructive earthquakes have been recorded.

The deposit is an “iron-oxide-copper-gold” (IOGC) type breccia deposit with a combination of sulphides and oxides. Feed material consists of primary sulphide material (bornite, chalcopyrite and pyrite), secondary sulphides (bornite, chalcocite, digenite and minor traces of covellite) and primary transitional ore (bornite as well as cuprite, atacamite, native copper and silver). The distribution statistics for each of the key variables are graphically displayed CuAS, CuCN, and CuR.

The ore deposit has a strong structural control; it is delimited between the regional faults Lechuza, Tunga, and Treinta Libras, with Andean strike (SE-NW), and normal-dextral displacement. Among these faults, there is a fault and fracture system with SW-NE strike, with a preferred dip to southeast, known as the Mina Justa fault system. These structures are usually of reverse type, with medium to low or up to subhorizontal angles, and their displacement ranging from a few centimeters to some tens of meters. Mineralized bodies (Main and Upper mantles) are interrupted by longitudinal faults parallel to the Lechuza and Tunga faults (Huaca fault system), which generate dislocations on said mineralized bodies.

Iron mineralization in the Marcona zone has a pattern of iron oxides copper-gold mantles. It comprises two deposits named Mina Justa and Manto Magnetita Oeste (Western Magnetite Mantle) that are placed in the Río Grade volcanic-sedimentary formation of the Upper Jurassic, which includes mainly andesitic lavas and pyroclastic flows, with thin interbedded arch sandstone and siltstone sequences. Large extensions of sulfide bodies and some oxide lenses have been subject to an intense hydrothermal alteration, which basically consisted of secondary iron oxides, actinolite, and chlorite, with albite, potassium feldspar, apatite, scapolite, and calcite. The economic mineralization of the Mina Justa deposit is closer to the surface to the north and west of the deposit, and reaches a depth of 550 m below the surface southeast of the deposit, the prevailing sulfides consist of bornite and chalcocite in the upper area of the ore deposit, and chalcopyrite in the lower part. On the other side, copper oxides characterize the mineralization of the Manto Magnetita Oeste deposit. Figure RE-10 shows the Project geological characteristics.

The Mina Justa ore deposit is composed of the Mina Justa (Main) and Manto Magnetita ore deposits, which are located in the volcanic sedimentary formation Río Grande of the Upper Jurassic. This ore deposit has a strong structural control and is mainly delimited by regional faults of Andean strike (SE-NW).

This ore deposit is a hydrothermal deposit of iron - copper - gold oxide type. The Mina Justa ore deposit extends over an oval area comprised of 2.1 km x 1.5 km with a depth of up to 150 m; while the Manto Magnetita ore deposit of copper oxides, has a tubular shape of 700 m x 350 m and 25 m and 35 m thick.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnits2024202320222021
Copper Total M lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Cathode M lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Metal in concentrate M lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe
Silver Metal in copper conc. oz  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Concentrate kt  ....  Subscribe
^ Guidance / Forecast.

Operational metrics

Metrics202320222021
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Stripping / waste ratio  ....  Subscribe  ....  Subscribe  ....  Subscribe
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

CommodityUnits202320222021
C1 cash costs (sold) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
** Net of By-Product.

Operating Costs

Currency202320222021
Total operating costs ($/t milled) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe

Financials

Units2024202320222021
Capital expenditures (planned) M USD  ....  Subscribe
Capital expenditures M USD  ....  Subscribe  ....  Subscribe
Sustaining costs M USD  ....  Subscribe  ....  Subscribe
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Operating Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Gross profit M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Pre-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
After-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
EBITDA M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe

Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 27, 2024

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021

Aerial view:

Lock

- subscription is required.