Mining Intelligence and News
Australia

Manna Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • Lithium
  • Spodumene
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Manna Lithium Project is an outcropping pegmatite exploration project.

In 2024, Global Lithium is progressing its Definitive Feasibility Study (DFS) for the Manna Lithium Project, which will incorporate an updated Mineral Resource Estimate, detailed mine schedule, metallurgical and process flowsheet test work results detailed operating and capital costs.

Completion of DFS expected CY24.

Additionally, environmental surveys have shown no significant impacts, and the company is progressing with the necessary mining lease applications and plans.

Owners

SourceSource
CompanyInterestOwnership
Global Lithium Resources Ltd. 100 % Indirect
Global Lithium Resources owns 100% of the Manna Lithium Project.

Contractors

Lock

- subscription is required.

Deposit type

  • Pegmatite
  • Vein / narrow vein

Summary:

The mineralisation at Manna is characterised as lithium-caesium-tantalum type (LCT) pegmatite swarms. The greenstone sequences within the vicinity of the Manna lithium deposit are dominated by mafic and felsic-intermediate igneous rocks, with minor sedimentary rocks, of the Kurnalpi Terrane of the Archean Yilgarn Craton. It is thought that the LCT pegmatite swarms, which includes the Manna lithium deposit, is likely to be associated with the Cardunia granitoid body.

Mineralisation at Manna remains open along strike in both directions and at depth. Forty-six sets of anastomosing pegmatite veins were interpreted and 16 of these, which contain significant lithium mineralisation, were used with the mineral resource model.

Dimensions
Thirty-five anastomosing pegmatites have been identified at the Manna deposit which extend from surface to a depth of 500 m.

The pegmatites strike northeast-southwest and dip to the southeast at 60–70°.

The main area has 16 mineralised pegmatites and has been drilled over an area of 1,700 m x 400 m. In the East zone, four mineralised pegmatite veins are delineated to the southeast of the main set, and have been drilled over an area of 1,400 m x 400 m and to a depth of 200 m. The West zone, to the northwest of main, includes 15 mineralised pegmatites and has been drilled over an area of 725 m x 250 m and to a depth of 500 m. The individual mineralised pegmatites are 1–14 m thick and have an average true thickness of 3.6 m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnitsAvg. AnnualLOM
Spodumene Concentrate kt 2212,220

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
Tonnes milled, LOM  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityUnitsAverage
Cash costs Spodumene USD  ....  Subscribe
All-in sustaining costs (AISC) Spodumene USD  ....  Subscribe
Assumed price Spodumene USD  ....  Subscribe
* According to 2023 study / presentation.

Operating Costs

Currency2023
OP mining costs ($/t milled) AUD  ....  Subscribe
* According to 2023 study.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Total CapEx $M AUD  ......  Subscribe
$M AUD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Feb 14, 2023
....................... Subscription required ....................... Subscription required Subscription required Apr 13, 2024
....................... Subscription required ....................... Subscription required Subscription required Apr 13, 2024
....................... Subscription required ....................... Subscription required Subscription required Apr 15, 2024
....................... Subscription required ....................... Subscription required Subscription required Apr 13, 2024

Total WorkforceYear
...... Subscription required 2023

Aerial view:

Lock

- subscription is required.