Categories

Summary

Mine TypeOpen Pit & Underground
Study CompletedFeasibility
StagePermitting
Commodities
  • Lithium
  • Spodumene
Mining Method
  • Truck & Shovel / Loader
  • Longhole open stoping
  • Pillar mining
Project Timeline... Lock
Mine Life... Lock
SnapshotThe Manna Lithium Project is a hard-rock lithium project based on outcropping LCT-type pegmatite mineralisation..

In 2025, Global Lithium Resources Limited advanced the project through completion of a robust and optimised Definitive Feasibility Study (DFS), confirming Manna as a long-life and economically resilient lithium asset and positioning the project toward a Final Investment Decision (FID).

Manna is confirmed as the third largest lithium deposit in the Eastern Goldfields, based on a conventional open-pit operation transitioning to underground mining.

On 25 August 2025, the Manna Lithium Project was granted Mining Lease M28/414 by the Minister for Mines, Petroleum and Exploration of Western Australia for a 21-year term, representing a critical permitting milestone for project development.

Owners

SourceSource
CompanyInterestOwnership
Global Lithium Resources Ltd. 100 % Indirect
Global Lithium Resources owns 100% of the Manna Lithium Project.

Contractors

Lock

- subscription is required.

Deposit type

  • Pegmatite
  • Vein / narrow vein

Summary:

The Manna deposit is characterised as lithium-caesium-tantalum (LCT) type pegmatite swarms. The greenstone sequences within the vicinity of the Manna deposit are dominated by mafic and felsicintermediate igneous rocks, with minor sedimentary rocks, of the Kurnalpi Terrane of the Archean Yilgarn Craton. It is thought that the LCT pegmatite swarms, which includes the Manna lithium deposit, is likely to be associated with the Cardunia granitoid body.

The Manna deposit is underlain by greenstone and granitoid rocks of the Kurnalpi Terrane. Two cratonscale structural corridors transect the project area: the Keith-Kilkenny Lineament, known locally as the Roe Shear Zone, and the Celia Fault, locally known as the Claypan Shear Zone. Greenstone sequences are dominated by mafic and felsic intermediate igneous rocks, with minor sedimentary rocks.

There are forty-two sets of anastomosing pegmatite veins which contain significant lithium mineralisation and used for resource estimation. The pegmatites have been defined from geological logging and surface mapping. The lithium-mineralised zones were defined using all samples which were logged as either pegmatite in Lith1 or Lith2 from the logging. An upper cutoff limit of 8% for iron (Fe) was also applied to exclude samples with a significant amount of country rock.

The pegmatite veins strike northeast-southwest and dip at -60° to -70° to the southeast. The main area is a set of fourteen pegmatites which has been drilled over an area of 1,900m by 400m and to a depth of 480m. There are fourteen pegmatites to the north, four to the east and ten pegmatites to the southwest of the main area. The individual mineralised pegmatites are 1m to 14m thick and have an average thickness of 3.6m.

Mineralisation at Manna remains open at depth and down dip to the northeast. Visual logging along the 700m long outcrop indicates that the lithia mineralogy varies from spodumene-only in the southwest to spodumene-dominant to the northeast (with up to 10% lepidolite by volume). The pegmatite dykes dip at approximately 70–80° to the southeast, cutting across north-south trending greenstones dominated by basalt and gabbro. Weathering of the pegmatite is negligible, and fresh spodumene can be observed at surface.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Water usage

Parameter2025
Fresh water 12.8 l/s

Commodity Production

CommodityProductUnitsAvg. AnnualLOM
Spodumene Concentrate kt 236 *2,764 *
Li2O t 0 *
* According to 2025 study.

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping ratio OP  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Tonnes milled, LOM  ....  Subscribe
* According to 2025 study.

Production Costs

CommodityAverage
Cash costs Spodumene  ....  Subscribe
All-in sustaining costs (AISC) Spodumene  ....  Subscribe
Assumed price Spodumene  ....  Subscribe
* According to 2025 study / presentation.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Total CapEx $M AUD  ......  Subscribe
OP OpEx $M AUD  ......  Subscribe
UG OpEx $M AUD  ......  Subscribe
Processing OpEx $M AUD 0.9
Royalty payments $M AUD  ......  Subscribe
EBITDA (LOM) $M AUD  ......  Subscribe
After-tax Cash Flow (LOM) $M AUD  ......  Subscribe
After-tax NPV @ 8% $M AUD  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 22, 2025

Workforce

Total WorkforceYear
...... Subscription required 2023

Aerial view:

Lock

- subscription is required.