Mine TypeOpen Pit
StagePreliminary Economic Assessment
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Project Timeline... Lock
Mine Life... Lock
SnapshotThe Scoping Study has been undertaken for the purpose of evaluating the potential development of a heap leach (HL) operation at the APG(Abujar-Pischon-Golikro) deposit which is part of the Abujar Gold Project in Côte d’Ivoire.

Since commencement, ore processed at Abujar has primarily been mined from the AG open pit. Mining has focused on AG Main stages 1, 2 and 3 with some contributions from AG South stage 1 pit. AG Main open pit stage 4 and stage 5 cutbacks are due to be completed in 2024 and 2025 respectively, whereafter mining will move on to AG South cutback pits. Mining in APG starts in 2026. The APG open pit is approximately 9km from the processing plant, the current LOMP assumes ore to be transported from APG to the existing Abujar processing plant.

In the first quarter of 2024, Tietto has completed ore reserve drilling at the APG deposit, 7km from the mine. Focus is now on exploration drilling to extend the AG deposit and a parallel zone of mineralisation to the west of

Owners

SourceSource
CompanyInterestOwnership
Government of Côte d’Ivoire 10 % Indirect
Zhaojin Mining Industry Co., Ltd. 88 % Indirect
On 24 May 2024, the Zhaojin Mining Industry Company Limited acquired a 90.52% interest in total in Tietto Mineral Limited as a result of the off-market takeover offer made by Zhaojin Capital (Hong Kong) Limited (an indirectly wholly-owned subsidiary of the Zhaojin Mining) for all of the issued shares in Tietto, not then held by the Zhaojin Mining. The Zhaojin Mining held 6.91% of the issued shares of Tietto before the acquisition. Tietto was an Australian-headquartered gold miner, operating the Abujar Gold Mine.

Tietto (TIE) has an 88% interest in the Abujar Gold Project with its local partners having a two percent interest. The Government of Côte d’Ivoire is entitled to a free-carried 10% interest in the Project on commencement of mining.

Contractors

Lock

- subscription is required.

Deposit type

  • Mesothermal
  • Vein / narrow vein

Summary:

The deposits making up the Abujar Gold Project are located within a NNE-SSW orientated body of granitoid migmatite and is hosted within in an interpreted regional shear structure. This is then enclosed within two mica granite bodies of similar interpreted orientation which are regionally referred to as granodiorites. Greenstones are rare in the immediate vicinity but have been mapped as isolated bodies to the south and east.

Two styles of deformation are interpreted to be present within the drill cores at Abujar; these include ductile deformation and brittle deformation. The gold mineralisation is interpreted to be related to the deformed granodiorite, in shear zones, with sulphides (mainly pyrite and minor chalcopyrite) associated with visible gold. The mineralisation seems to be located within the granodiorite at the boundary between two different intensities of deformation i.e. weakly deformed and highly strained.

Alteration is characterised by chlorite, sericite, calcite, secondary quartz and disseminated pyrite. This assemblage is well developed in schistose, foliated rocks with the presence of quartz veins or veinlets.

Deposits within the Abujar Project resemble typical shear zone deposits of the West African granite-greenstone terrane. The Abujar deposit (AG) is associated with a major regional shear zone and is developed in granodiorite hosts similar to that which hosts the Pischon & Golikro deposits (APG) and the interpreted extension areas in the Gamina deposits to the north (Gamina South and Centre). Mineralisation is potentially spatially related to the emplacement of intrusives and interpreted to be mesothermal in origin. Free gold in quartz vein stockworks and zones of silicification, associated with pyrite and chalcopyrite.

The gold mineralisation is typically found in linear domains with the contacts showing evidence of shearing with free gold frequently observed. Alteration is weak to severe depending on the development of the system. As noted, gold mineralisation is hosted within a continuous shear zone which is traced over 4.5km within Abujar and over 1.5km within Pischon and 2.5km within Golikro, however analysis of the drill holes within these deposits indicates that within this low-grade shear hosted halo, higher grade lodes occur which are slightly oblique to the strike of the shear. This is interpreted to be typical riedel ductile shear mineralisation, which is structurally controlled both at a local and regional scale.

Several occurrences of boudin structures are observed within the drill core, and it is hypothesized these structures control mineralisation both regionally and locally. Of particular note is the intersection of near vertical extremely high-grade plunging shoots (>5g/t) which can be interpreted within both the Abujar and Pischon Goliko Deposit. These can be seen in the long sections of the grade estimates.

All APG lodes have similar southwest-dipping orientations striking 30° and dipping at varying angles of inclination typically between 50 and 75°. These lodes appear to coincide with strong linear geological structures which are offset by several faults and have strike length from 200 metre to up to 1.2km. The lodes range in thickness from 2m to up to 40m, with the thicker zones general occurring where the higher grades occur, which is as expected for the structurally controlled style of mineralisation.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. AnnualLOM
Gold koz 85852
All production numbers are expressed as metal in doré.

Operational metrics

Metrics
Annual mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2022 study.

Production Costs

CommodityUnitsAverage
All-in sustaining costs (AISC) Gold USD  ....  Subscribe
Assumed price Gold USD  ....  Subscribe
* According to 2022 study / presentation.

Operating Costs

CurrencyAverage
OP mining costs ($/t mined) USD  ....  Subscribe
* According to 2022 study.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 5% $M USD  ......  Subscribe
After-tax NPV @ 5% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 7, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 7, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 7, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 7, 2024

Aerial view:

Lock

- subscription is required.