Chile

Penco Module Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • REE
Mining Method
  • Truck & Shovel / Loader
Project Timeline... Lock
Mine Life... Lock
SnapshotAclara’s Penco Module is among 25 large-scale projects featured, representing a combined potential investment in Chile. On September 17, 2024, Aclara announced that the Chilean government has unveiled a comprehensive "Industrial Strengthening Plan" for the Biobío region. This plan highlights the Penco Module as one of the key projects selected to bolster the region's future economic growth.

On September 25, 2023, the Company revised its permitting strategy to address concerns about native forests within the Penco Module project site, aiming to minimize impacts on the development timeline. The strategy involves submitting two EIAs covering the full life-of-mine. The first EIA ("EIA 1"), filed on June 10, 2024, covers the first six years and is under evaluation by the Environmental Assessment Service (SEA), a process expected to take 18–24 months. As of August 19, 2024, EIA 1 advanced to the next stage, with SEA issuing 394 observations, which the Company plans to address by Q1 2025.
Latest NewsAclara Receives Second Tranche Payment of US$12.5 Million From Cap's Strategic Investment in Chile     January 16, 2025

Owners

SourceSource
CompanyInterestOwnership
CAP S.A. 20 % Indirect
Aclara Resources Inc. (operator) 80 % Indirect
Aclara Resources’s material assets consist of interests in REE Uno SpA, a majority-owned Chilean subsidiary that holds the Penco Module.

On April 17, 2024, Aclara Resources Inc. announced the closing of the acquisition by CAP S.A. ("CAP") of its 20% equity ownership interest in REE Uno SpA, and receipt by the Company of the initial payment of approximately US$9.7 million in connection with such acquisition.

Contractors

Lock

- subscription is required.

Deposit type

  • Saprolite

Summary:

The Penco Module deposits have been defined as “regolith-hosted REE deposits” or “ion-adsorption deposits” (IAD). These are traditionally formed by tropical or subtropical weathering and decomposition of intrusive rocks with a primary enrichment in either mid/heavy REEs (peralkaline igneous rocks) or light REEs (peraluminous igneous rocks or carbonatites), where REEs are readily liberated by ionic solutions and are hence ion exchangeable (Wang et al., 2015; Dostal, 2017; Borst et al., 2020). Exchangeable REEs are associated with kaolinite and halloysite, the dominant clay minerals in IADs due to their role in adsorbing and fractionating REEs (Wu et al., 1990; Bau, 1991; Jeong, 2000; Bao and Zhao 2008; Williams-Jones et al., 2012; Sanematsu and Watanabe, 2016; Li et al., 2019; Yang, 2019; Borst et al., 2020 and references within).

The regolith profiles in the Project were developed through subtropical weathering of a peraluminous garnet-bearing granitoid, hence richer in LREEs. The regolith ranges between 25 to 48 m in thickness and is more developed in the garnet-rich granitoid than the other granitoids. The primary REE source is hosted in monazite-allanite and lesser xenotime, garnet and ilmenite. A secondary paragenesis formed by a late propylitic hydrothermal alteration (chlorite, sericite, epidoteallanite, locally biotite) replaced monazite with allanite and torite, and was relevant for the subsequent REE fractioning (Dold, 2015).

The exchangeable REE fraction in the Penco Module orebodies was obtained after the destruction of allanite, xenotime, and garnet (not refractory minerals) by weathering. The exchangeable REE is inferred to be weakly adsorbed onto clay minerals, dominantly by kaolinite and less by illite and/or smectite. This primary adsorption is observed by the positive correlation between kaolinite abundance and REE recovery. Further confirming this observation, clay mineralogy from DRX characterization indicates kaolinite as the dominant clay mineral (after halloysite).

Geology and Mineralization
The Project covers an area of 6 km x 3 km, located in the Coastal Range in the Biobio Region in central-southern Chile and is hosted in a carboniferous granitoid batholith complex intruding the eastern metamorphic basement series. Four main rock complexes are recognized: Metapelites (Paleozoic basement), Eastern Concepcion Plutonic Complex (oldest intrusion, east of the project), Penco Granitoid Complex (host of REE-rich ore bodies) and the Quartz-Diorite (youngest intrusion). Locally, REE anomalies were detected through soil analysis, using a portable XRF in roadcut exposures. These findings were better defined by a radiometric flight, NanoTEM and LIDAR topography, confirming that the garnet-bearing granitoid (GG) is strongly correlated with the radiometric anomaly of thorium (Th).

These rocks have the development of an extensive and deeply weathered regolith (+/- 40 m). This regolith contains abundant clay minerals that were locally enriched with REE in the favorable horizons. Aclara carried out a geochemical program in the zone that found significant yttrium (Y), cerium (Ce) and thorium (Th) anomalies.

The regolith profile developed clay minerals with capacity for cation adsorption. Of them, the GG is the source of the REE mineralization and is the richest in exchangeable REE. Other lithologies such as the biotite-bearing diorite (DRT) and metapelites (MP) contain decreasing levels of exchangeable REE, based on proximity to the GG, due to secondary enrichment of REE-rich fluids sourced from the GG following lateral migration under specific geochemical conditions (pH, alteration). Thus, mineralization depends on GG weathering intensity and topography (flatter relief allows for thicker regolith profiles and preserves ore bodies).

The Penco regolith profile is up to 35 m thick and comprises, from the bottom up: Unaltered bedrock (Horizon D), transitional zone (Horizon C2), semi-weathered zone (Horizon C1), completely weathered zone (Horizon B), pedolith and topsoil (Horizon A).

The regolith profile is identified as the biotite-bearing diorite (DRT), metapelite (MP) and garnet-bearing granitoid (GG), the latter was used ahead as the model. Apart from core logging, geochemistry (major elements and total REE), mineralogy, pH, and exchangeable REE with ammonium sulfate were used to define the geologic units.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityProductUnitsAvg. AnnualLOM
Total Rare Earth Oxides Concentrate kt 9.6
REE Oxide t 7748,901
REE Carbonate t 1,275

Operational metrics

Metrics
Hourly processing rate  ....  Subscribe
Annual ore mining rate  ....  Subscribe
Annual processing rate  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2021 study.

Production Costs

CommodityUnitsAverage
Cash costs Total Rare Earth Oxides USD  ....  Subscribe
All-in sustaining costs (AISC) Total Rare Earth Oxides USD  ....  Subscribe
Assumed price Total Rare Earth Oxides USD  ....  Subscribe
* According to 2021 study / presentation.

Operating Costs

CurrencyAverage
OP mining costs ($/t mined) USD  ....  Subscribe
Processing costs ($/t milled) USD  ....  Subscribe
G&A ($/t milled) USD  ....  Subscribe
Total operating costs ($/t milled) USD  ....  Subscribe
* According to 2021 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Closure costs $M USD  ......  Subscribe
Total CapEx $M USD  ......  Subscribe
OP OpEx $M USD  ......  Subscribe
Processing OpEx $M USD 142
G&A costs $M USD 44
Total Taxes $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 5% $M USD  ......  Subscribe
Pre-tax NPV @ 10% $M USD  ......  Subscribe
Pre-tax NPV @ 8% $M USD  ......  Subscribe
After-tax NPV @ 5% $M USD  ......  Subscribe
After-tax NPV @ 10% $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 15, 2021
....................... Subscription required ....................... Subscription required Subscription required Sep 15, 2021
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 17, 2025

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2021

Aerial view:

Lock

- subscription is required.