Mining Intelligence and News
Papua New Guinea

Misima Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • Gold
  • Silver
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotKingston plans to leverage off the strong production history at Misima and construct a new treatment facility and modern infrastructure on the footprint of the historic mine, establishing a new standalone, long-life gold mining and processing operation underpinned by two major ore sources – a cutback of the existing Umuna open pit and an expansion of the existing small pit at Ewatinona in the Quartz Mountain area.

The Misima Project offers great potential for additional resource growth through exploration success targeting extensions and additions to the current Resource base.

Discussions are progressing with numerous groups to move the Misima Gold Project towards development. The primary aim is to partner with an experienced and credible mining company that has the balance sheet and expertise to assist in a joint development.

Owners

SourceSource
CompanyInterestOwnership
Kingston Resources Ltd. 100 % Indirect
Kingston Resources owns a 100% interest in Gallipoli Exploration (PNG) Limited. Kingston Resources interest in Gallipoli Exploration is held by its 100% owned subsidiary, WCB Pacific Ltd. WCB Pacific Ltd owns 100% of Gallipoli Exploration (PNG) Limited. The Project is located within EL1747 which was first granted on 21 March 2011 under the PNG Mining Act 1992 to Gallipoli Exploration (PNG) Limited.

Deposit type

  • Epithermal
  • Breccia pipe / Stockwork

Summary:

Misima Island forms part of the Louisiade Archipelago which is a continuation of the Papuan Fold Belt of the Papuan Peninsula offshore eastwards through the Papuan Plateau. The Misima Gold Project comprises two main deposits, Umuna and Ewatinona, and multiple reconnaissance exploration targets along and adjacent to the 10km strike length of the Umuna Fault Corridor that hosts the historical Umuna deposit, and Quartz Mountain area that hosts the Ewatinona deposit.

Mineralisation deposit style on Misima Island is best described as low sulphidation carbonate base-metal epithermal. Mineralisation is strongly controlled by pre-existing structures that have been reactivated and mineralised over time.

The Umuna deposit is a complex fault array with a large SE-NW striking fault zone hosting the majority of the precious metal mineralisation, with numerous ancillary splays developed in the footwall east of the main structure. Internal structures within the fault complex and the intersection of structures and splays with the dominant Umuna Fault, are loci for zones of welldeveloped mineralisation.

The Ewatinona deposit is dominated by brecciated porphyry units which are cut by steeply dipping faults trending northwest, west northwest and southwest. Mineralised structures can range from crackle brecciated porphyry with base metal sulphide and quartz-carbonate-base metal sulphide infill, to more well-defined fault breccia with stockwork veining and crackle brecciation haloes.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. AnnualLOM
Gold koz 1282,379
All production numbers are expressed as metal in doré.

Operational metrics

Metrics
Annual processing capacity  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
* According to 2022 study.

Production Costs

CommodityUnitsAverage
Credits (by-product) Gold AUD  ....  Subscribe
All-in sustaining costs (AISC) Gold AUD  ....  Subscribe
Assumed price Silver AUD  ....  Subscribe
Assumed price Gold AUD  ....  Subscribe
* According to 2022 study / presentation.
** Net of By-Product.

Operating Costs

CurrencyAverage
OP mining costs ($/t milled) AUD  ....  Subscribe
Processing costs ($/t milled) AUD  ....  Subscribe
G&A ($/t milled) AUD  ....  Subscribe
* According to 2022 study.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Sustaining CapEx $M AUD  ......  Subscribe
Gross revenue (LOM) $M AUD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M AUD  ......  Subscribe
Pre-tax NPV @ 7% $M AUD  ......  Subscribe
After-tax NPV @ 7% $M AUD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 19, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 19, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 19, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 19, 2024

Total WorkforceYear
...... Subscription required 2022

Aerial view:

Lock

- subscription is required.