Mining Intelligence and News
Australia

Wiluna West JWD Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotJWD Project is producing high grade DSO hematite project.

Following improvement in iron ore prices (which are up ~ 50% from when mining activity was suspended) the Company has initiated a restart of mining operations at JWD.

As of August 27, 2024, CuFe is set to sell the JWD iron ore mine. The mine will be transitioned into care and maintenance during the interim period.

Owners

SourceSource
CompanyInterestOwnership
Wiluna Fe Pty Ltd. (operator) 100 % Direct
CuFe Ltd. 100 % Indirect
CuFe (via Wiluna FE Pty Ltd) holds a 100% interest in the Mining Rights Agreement over the Wiluna West JWD deposit (iron ore rights).

As of August 27, 2024, CuFe is set to sell its 100 per cent owned JWD iron ore mine to Newcam Minerals. The sale will be executed through CuFe subsidiary Wiluna Fe. Completion of the sale will be subject to various conditions including approval of CuFe shareholders, with a meeting expected to be held in early October 2024.

Contractors

Lock

- subscription is required.

Deposit type

  • Banded iron formation

Summary:

The Wiluna West project extends 45 km in strike over the Joyners Greenstone Belt, near the northern margin of the Yilgarn Craton. The Joyner’s Find Greenstone Belt is a narrow (5 km to 10 km) northsouth striking greenstone belt comprising prominent ridges (in the central and eastern portion) of Banded Iron Formations (BIF) intercalated with mafic and ultramafic schists with minor chert and clastic sediment horizons.

High grade hematite mineralisation occurs within three main BIF ridges (Units A, B and C) with grade occurrences of up to 69% Fe. Iron mineralisation occurs within BIFs surrounded by inter- bedded mafic and ultramafic schist units. Unit B and Unit C have been partially drill tested by GWR for hematite mineralisation. The two main ridges show distinctive mineralisation styles with B ridgeshowing a much lower proportion of remnant bedding and generally a significantly higher portion of haematite especially in the top 20 m. Mineralisation of the B ridge is also much more continuous along strike occurring semi continuously for over 15 km. The mineralisation on the C ridge typically occurs in a series of pods of up to 20 Mt separated by poorly or un-mineralised BIF. The JWD deposit represents part of Unit B.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

Operational metrics

Metrics2022
Ore tonnes mined  ....  Subscribe
Total tonnes mined  ....  Subscribe
Tonnes processed  ....  Subscribe

Production Costs

CommodityUnits2022
C1 cash costs Iron Ore AUD  ....  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 11, 2024
....................... Subscription required ....................... Subscription required Subscription required Jan 11, 2024

Aerial view:

Lock

- subscription is required.