Mining Intelligence and News
Australia

Cannington Mine

Click for more information

Categories

Overview

Mine TypeUnderground
StatusActive
Commodities
  • Silver
  • Lead
  • Zinc
Mining Method
  • Longhole open stoping
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotCannington is one of the world’s largest producers of silver and lead and consists of an underground hard rock mine and surface processing facility, a road-to-rail transfer facility and a concentrate handling and ship loading facility at the Port of Townsville.

In FY24, South32 continued trialling battery electric mobile equipment at Cannington, with the aim of reducing the use of diesel vehicles and equipment and their associated GHG emissions. Learnings from the trials were shared with the Electric Mine Consortium and will be used to inform our next generation of mines.

Owners

SourceSource
CompanyInterestOwnershipInvestor's Info
South32 Ltd. 100 % Indirect
Cannington mine is 100% owned by South32 Ltd. through its Australian subsidiary South32 Cannington Pty Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Metamorphic hosted
  • Broken Hill-type (BHT)

Summary:

Cannington is a Broken Hill Type (BHT) silver-lead-zinc massive sulphide deposit hosted by Proterozoic age high-grade metamorphic lithologies of the Soldiers Cap Group, located in the Eastern Succession of the Mount Isa Block. Mineralisation is stratiform bound along the limbs of a tight isoclinal recumbent synform with an easterly dip and a southerly plunge. The core of the synform is composed of amphibolite with encompassing silver-lead-zinc sulphide mineralisation. The mineralisation has been divided into nine types based on textural, mineralogical and geochemical characteristics which assist in defining metallurgical performance.

The Cannington mineralisation is hosted within a 70 m to 90 m thick of interbedded garnetiferous psammite and basic volcanic units that enclose a fine to medium grained central amphibolite body up to 100 m thick. The psammite is itself intercalated with muscovite-sillimanite schist and enclosed by migmatitic quartzon feldspathic gneiss. Pegmatite horizons that are semi-conformable within the deposit sequence are thought to be predominantly the result of partial melts of clastic rocks within this package (Mark, 1993).

Structure
The psammite sequence is folded into a tight, northerly striking isoclinal recumbent fold that plunges to the south with limbs dipping between 40O and 70O to the east as the result of the second of four structural events (D1 to D4) described by Bailey (1998). Two major northwest trending D4 faults offset the sequence. The Trepell Fault divides the ‘Northern Zone from the ‘Southern Zone’ and the Hamilton Fault forms a southern limit of the Southern Zone’. This Proterozoic host sequence is truncated up-plunge in then Northern Zone at the sub-horizontal unconformity with the younger Cretaceous sediments that are between 10 m and 60 m thick in the Cannington Operations area.

The Southern Zone has a strike length of 600 m to 700 m and extends to approximately 650 m below surface. The metamorphosed sediment package has been folded into a synform structure and is displaced on a local scale by north northeast and northeast trending faults. The northeast trending faults are interpreted as conjugate sets to the Trepell and Hamilton Faults as a result of sub- horizontal sinistral movement.

The Northern Zone strike is approximately 500 m and extends to around 400 m below surface. It is less deformed than the Southern Zone and typically dips east, interpreted as being the eastern limb of an antiform.

Mineralisation
Silver, lead and zinc mineralisation is stratiform within the garnetiferous psammite and mafic host rocks and varies in textural, mineralogical and geochemical characteristics that have been classified as ‘mineralisation types’. These are divided into footwall (western limb), hangingwall (eastern limb) and fold hinge lead-rich and zinc-rich domains, with the mafic rocks more complex in mineralogy than the siliceous rocks as mineralisation grades from outer Pb-Ag to inner zinc zones. The sulphide mineralogy is dominated by coarse grained galena (PbS), sphalerite (ZnS), with silver mainly contained in freibergite (Cu6(Ag,Fe)6Sb4S13).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024202320222021202020192018201720162015
Silver koz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe12,201 12,491 15,603 21,393 22,601 
Lead kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe101 104 132 173 183 
Zinc kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe52 41 70 79 72 
Zinc Equivalent kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe194 187 
All production numbers are expressed as payable metal. ^ Guidance / Forecast.

Operational metrics

Metrics2024202320222021202020192018201720162015
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2,495 kdmt2,355 kdmt3,036 kdmt3,149 kdmt3,289 kt
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2,725 kwmt2,463 kwmt2,909 kwmt3,289 kwmt3,418 kt
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe3.4 Mt
^ Guidance / Forecast.

Production Costs

Commodity production costs have not been reported.

Operating Costs

Currency202420232022202120202019201820172016
Total operating costs ($/t milled) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Financials

Units20242023202220212020201920182017
Capital expenditures (planned) M USD
Growth Capital M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Sustaining costs M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 55   51   36  
Capital expenditures M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 467   584   768  
EBIT M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 104   183   308  
EBITDA M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 161   230   364  

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 10, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 20, 2024

EmployeesContractorsTotal WorkforceYear
...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required 2014

Aerial view:

Lock

- subscription is required.