Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • Lithium
  • Tantalum
  • Spodumene
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotThe Rose Lithium-Tantalum Project is one of the highest purity hard rock spodumene deposits with low iron and mica content.

The project is expected to produce technical and chemical grade spodumene concentrates, as well as a tantalite concentrate.

On August 11, 2022, an engineering study for a chemical plant to produce high quality lithium hydroxide monohydrate was completed by Metso Outotec and WSP in Canada. Critical Elements Lithium Corp. is not in a position to confirm whether the hydroxide chemical plant will ever be implemented or if it will form part of the Rose project.

In February 2025, the first environmental authorization required for the construction and implementation of the Rose project was received. Corporation expects to be in a position to commence the activities subject to this authorization once all the conditions mentioned in the Federal and Provincial Project approvals have been met, the required Project financing has been obtained and FID is made.
Latest NewsCritical Elements Lithium Obtains Its First Environmental Authorization to Prepare Rose Lithium-Tantalum Site for Construction     February 26, 2025

Owners

SourceSource
CompanyInterestOwnership
Critical Elements Lithium Corp. 100 % Direct
The Rose property is wholly owned by the Critical Elements Lithium Corp.

Contractors

Lock

- subscription is required.

Deposit type

  • Pegmatite

Summary:

The Rose property is located in the southern portion of the Middle and Lower Eastmain Greenstone Belt.

The Middle and Lower Eastmain Greenstone Belt (MLEGB) contains more than one hundred mineral showings exhibiting a variety of ages, host rocks, styles (disseminated sulphides, massive sulphides, veins and dykes) and metal suites. The mineral occurrences of the MLEGB have been divided into six (6) types according to Moukhsil et al. (2007):
1) Sulphide facies iron formation.
2) Volcanogenic mineralization.
3) Magma-related mineralization.
4) Orogenic mineralization.
5) Gold-bearing mineralization associated with oxide- or silicate-facies iron formations.
6) Pegmatite-related mineralization.

Types 1 to 3 are associated with an episode of volcanic arc construction (volcanic cycles 1 to 4). Types 4 and 5 are contemporaneous with major deformation events (D1 and D2), whereas Type 6 is associated with post-tectonic intrusions.

Based solely on its geological environment, the Rose property has potential for a number of deposit types. However, based on the known discoveries, only the type recognized in Type 6 (Rare-Element LCT-type Pegmatite) will be discussed herein.

Gabbros, pyroxenites and diorites cut across the property geology. The Pivert-Rose property also hosts pegmatites, occurring as irregular but generally continuous lenses within the biotite schists.

Other rock types, including gneiss, dacite, quartzite and conglomerate, have also been reported. Lithologies are generally well foliated with a SE orientation, except for the more massive and unfoliated granites and pegmatites.

Mineralization recognized to date on the Rose property includes rare-element LCT-type pegmatites (Block A) and molybdenum occurrences (Block A). An iron occurrence (Block B) is also mentioned in the government database.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnitsAvg. AnnualLOM
Li2O (chemical grade) Concentrate kt 1582,681
Li2O (technical grade) Concentrate kt 46783
Tantalum Concentrate kt 0.6
Spodumene Concentrate kt 204

Operational metrics

Metrics
Daily ore mining rate  ....  Subscribe
Daily processing rate  ....  Subscribe
Daily processing capacity  ....  Subscribe
Annual processing rate  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityUnitsAverage
Credits (by-product) Spodumene USD  ....  Subscribe
Total cash costs Spodumene USD  ....  Subscribe
Assumed price Li2O (technical grade) USD  ....  Subscribe
Assumed price Li2O (chemical grade) USD  ....  Subscribe
Assumed price Ta2O5 USD  ....  Subscribe
* According to 2023 study / presentation.
** Net of By-Product.

Operating Costs

CurrencyAverage
OP mining costs ($/t mined) CAD  ....  Subscribe
OP mining costs ($/t milled) CAD  ....  Subscribe
Processing costs ($/t milled) CAD  ....  Subscribe
G&A ($/t milled) CAD  ....  Subscribe
Total operating costs ($/t milled) CAD  ....  Subscribe
* According to 2023 study.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M CAD  ......  Subscribe
Sustaining CapEx $M CAD  ......  Subscribe
Total CapEx $M CAD  ......  Subscribe
OP OpEx $M CAD  ......  Subscribe
Processing OpEx $M CAD 709.7
Transportation (haulage) costs $M CAD 598.2
G&A costs $M CAD 544.3
Total OpEx $M CAD  ......  Subscribe
Total Taxes $M CAD  ......  Subscribe
Royalty payments $M CAD  ......  Subscribe
Gross revenue (LOM) $M CAD  ......  Subscribe
Operating margin, %  ......  Subscribe
Pre-tax Cash Flow (LOM) $M CAD  ......  Subscribe
After-tax Cash Flow (LOM) $M CAD  ......  Subscribe
Pre-tax NPV @ 5% $M CAD  ......  Subscribe
Pre-tax NPV @ 10% $M CAD  ......  Subscribe
Pre-tax NPV @ 8% $M CAD  ......  Subscribe
After-tax NPV @ 5% $M CAD  ......  Subscribe
After-tax NPV @ 10% $M CAD  ......  Subscribe
After-tax NPV @ 8% $M CAD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Mar 6, 2025
....................... Subscription required ....................... Subscription required Subscription required Aug 29, 2023
....................... Subscription required ....................... Subscription required ........... Subscription required Aug 29, 2023
....................... Subscription required ....................... Subscription required Subscription required Aug 29, 2023
....................... Subscription required ....................... Subscription required Subscription required Mar 6, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 13, 2025

EmployeesYear
...... Subscription required 2023

Aerial view:

Lock

- subscription is required.