Overview

Mine TypeIn-Situ
StagePreliminary Economic Assessment
Commodities
  • Lithium
  • Potassium
Mining Method
  • Brine mining
Project Timeline... Lock
Mine Life... Lock
SnapshotThe Candelas Project is part of the Hombre Muerto basin, one of the most globally prolific salt flats.

The Candelas Project is located approximately 40 km ESE of the HMW Project. The HMW Project is divided into four production phases, with Phase 4 targeting 60ktpa of lithium carbonate equivalent (LCE) by 2030, including lithium brine sourced from both HMW and Candelas.

Owners

SourceSource
CompanyInterestOwnership
Galan Lithium Ltd. 100 % Indirect
Candelas project is owned by Galan Lithium Ltd.

Deposit type

  • Brine

Summary:

The Candelas licence area is located within a structurally controlled basin (graben) and is part of the Hombre Muerto salar. The salar hosts a world-renowned lithium brine deposit. The lithium is sourced locally from weathered and altered felsic ignimbrites and is concentrated in brines hosted within basin fill alluvial sediments and evaporites.

The extents of the resource is approximately 2.7 km (easting) by 9.5 km (northing) by 600 m (vertical), giving a total volume of 15,390 km3.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. AnnualLOM
Lithium kt 14364
All production numbers are expressed as carbonate.

Production Costs

CommodityUnitsAverage
Cash costs Li2CO3 USD  ....  Subscribe
Assumed price Li2CO3 USD  ....  Subscribe
* According to 2021 study / presentation.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Pre-tax NPV @ 8% $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 30, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Sep 23, 2024

Aerial view:

Lock

- subscription is required.