Esterhazy Mine

This page is not tailored to
devices with screen width under 750 px.
 Location:
15 km E from Esterhazy, Saskatchewan, Canada

  Address:
Highway 80 E
Esterhazy
Saskatchewan, Canada
S0A 0X0
Phone  ...  Subscription required
Fax(306)-745-2100
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in Canada
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeUnderground
Commodities
  • Potash
Mining Method
  • Room-and-pillar
Processing
  • Flotation
  • Dense media separation
Mine Life73 years (as of Jan 1, 2019)
Mosaic continues the expansion of capacity in its Potash segment with the K3 shafts at Esterhazy mine. Following ramp-up, these shafts are expected to add an estimated 0.9 million tonnes to the company's annual potash operational capacity. This will provide an infrastructure to move ore from K3 to the K1 and K2 mills. In December 2018, the production hoist for K3 was commissioned. As K3 production ramps up, the Mosaic plans to cease underground mining at K1 and K2 by mid-2022.


Owners & OPERATOR

Source: p. 16, 172
CompanyInterestOwnership
The Mosaic Company 100 % Indirect
Mosaic Potash Esterhazy Limited Partnership (operator) 100 % Direct

Deposit Type

  • Evaporite


Summary:

Extensive potash deposits are found in the southern half of the Province of Saskatchewan. The potash ore is contained in a predominantly rock salt formation known as the Prairie Evaporites. The Prairie Evaporites deposits are bounded by limestone formations and contain the potash beds.


Mining Methods

  • Room-and-pillar


Summary:

Esterhazy utilizes shaft mining. Traditional potash shaft mining takes place underground at depths of over 1,000 meters where continuous mining machines cut out the ore face and load it onto conveyor belts. The ore is then crushed, moved to storage bins and hoisted to refineries above ground.

The underground mining operation uses a conventional room and pillar mining technique which consists of a series of equally-spaced rooms interconnected by access tunnels. The ore is mined with a continuous mining machines consisting of rotating heads studded with tungsten carbide steel bits. The continuous miners feed the ore on to an extensible belt conveyor attached to the rear of the miner. The extensible conveyors feed a number of conveyor belts which carry the ore to storage bins. From the storage bins, the ore travels by conveyor to the crushers which reduce the ore into pieces no larger than about six inches in diameter. Following crushing, the ore is transported by conveyor belt to the shaft skips. Each of the two shafts is equipped with a pair of ore-hoisting skips which operate in tandem - one skip moving up to the surface to be unloaded, while the other is on its way down to pick up more ore.

Company continues the expansion of capacity in Potash segment with the K3 shafts at Esterhazy mine. Following ramp-up, these shafts are expected to add an estimated 0.9 million tonnes to annual potash operational capacity. This will provide an infrastructure to move ore from K3 to the K1 and K2 mills. In September 2019, the first four rotor mining machine began cutting ore underground at K3. In December 2019, the second four rotor mining machine began cutting and shaft excavation was completed. A total of 1.4 million tonnes of K3 ore was transported from K3 to K2 via the overland conveyor infrastructure in 2019. As K3 production ramps up, company plans to cease underground mining at K1 and K2 by mid-2022.


Crushing and Grinding


Processing

  • Flotation
  • Dense media separation

Source: Subscription required

Summary:

The underground workings of the K1 and K2 mine are connected. Four different potash products are produced between the two mills. The four products are classified according to size or grade. These products, in descending order from largest to the smallest, are: Compacted Granular, Natural Crystal Granular, Standard, and White Muriate. Various production processes are utilized in making these products, but all start with crushing the ore into particles less than 9.5 mm. Reduced to this size, the ore separates into individual crystals of either potassium chloride or sodium chloride. The crushed ore is mixed with brine and screened. Particles which are larger than 1.7 mm are diverted to heavy media and particles smaller than 1.7 mm drop through the screen and go on to flotation.

The heavy media process produces Natural Crystal potash. In this process, the particles of potassium chloride and sodium chloride are introduced into a brine solution to which magnetite has been added. ........

Recoveries & Grades:

CommodityParameter2019201820172016201520142013
Potash Head Grade, % 23.623.72424.423.723.823.8

Production:

CommodityUnits201920182017201620152014
Potash Mt  ......  Subscription required  ......  Subscription required4.34.24.34
Subscription required - Subscription is required.

Operational Metrics:

Metrics201920182017201620152014
Ore tonnes mined  ......  Subscription required  ......  Subscription required  ......  Subscription required12.6 Mt13.1 Mt12.4 Mt
Annual production capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required5.3 Mt of potash
Subscription required - Subscription is required.

Reserves at December 31, 2019:

CategoryTonnage CommodityGrade
Proven & Probable 872 Mt K2O 24.6 %


Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 20, 2020
....................... Subscription required ....................... Subscription required Subscription required Sep 20, 2020
....................... Subscription required ....................... Subscription required Subscription required Sep 20, 2020
....................... Subscription required ....................... Subscription required Subscription required Sep 20, 2020
....................... Subscription required ....................... Subscription required Subscription required Sep 20, 2020
Subscription required - Subscription is required.


Corporate Filings & Presentations:

DocumentYear
................................... Subscription required 2019
................................... Subscription required 2018
Form 10-K 2017
Form 10-K 2016
Other 2009
Subscription required - Subscription is required.

Aerial view:

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2020 MDO Data Online Inc.