Mining Intelligence and News
Australia

Meandu Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
Production Start... Lock
Mine Life... Lock
SnapshotMeandu Mine operates as an open-cut coal mine, supplying black thermal coal to the nearby Tarong power stations.

Meandu Mine King 2 East (K2E) Extension Project remains a priority to secure a long-term fuel supply for the Tarong Power Stations. Stanwell are continuing to work with the Federal Government to secure the approvals to progress the King 2 East extension project.

Mining in the Existing Surface Rights Area in the King 2 East Box Cut (an extension of the King 2 East Pit in the north-east corner of the mine) is currently planned to commence with topsoil removal in March 2025, and first waste stripping commencing in May 2025. The first blast in the area is scheduled for July 2025. Work to prepare for mining, including the installation of infrastructure and upgrading of haul roads, has commenced.

Owners

SourceSource
CompanyInterestOwnership
Stanwell Corporation Limited 100 % Indirect
TEC Coal Pty Ltd, a wholly owned subsidiary of Stanwell Corporation Limited, owns the Meandu Mine.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

Meandu Coal Mine is located in the late Triassic Age (~200-220 Ma) Tarong Basin approximately 200 km north west of Brisbane, Queensland. A thermal product coal is produced from three main seams in the Tarong Beds to supply Stanwell Corporation’s Tarong Power Station (TPS) (Simmons, Edwards and Ferdinands, 2013).

The Tarong Beds coal measures consist of thick coal seams which are interlayered with fine grained clay, quartz-rich or iron-rich stone bands of variable thickness within a sedimentary package of conglomerates, sandstones, siltstones and mudstone. Pegrem (1995) previously classified the coal from the Tarong Beds as high ash, low volatile, low sulphur steaming coal with weak coking properties.

There are three main seams being mined at Meandu Mine, namely Ace, King and Queen. The seams increase in ash content with stratigraphic depth (Young, 2013). As the coal at Meandu Mine is not able to be easily “free dug” it is blasted in order for it to be mined.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits202420232022202120202019201820172016
Coal (thermal) t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe5,809,5916,005,9355,573,8194,265,614
All production numbers are expressed as clean coal.

Operational metrics

Metrics202420232022202120202019201820172016
Coal tonnes mined  ....  Subscribe  ....  Subscribe
Raw coal annual capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe7,685,272 t7,698,586 t7,447,020 t5,243,284 t
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe7,961,919 t of ROM coal8,132,043 t of ROM coal7,814,977 t of ROM coal5,874,786 t of ROM coal

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 6, 2025
....................... Subscription required ....................... Subscription required Subscription required Dec 23, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Jan 6, 2025
....................... Subscription required ....................... Subscription required Subscription required Dec 23, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 23, 2024

Total WorkforceYear
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017

Aerial view:

Lock

- subscription is required.