Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
Production Start... Lock
Mine Life... Lock
SnapshotMeandu Mine is an open-cut coal operation that supplies coal exclusively to the adjacent Tarong Power Stations. The mine consists of four active pits and maintains a continuous coal supply to the power stations via a long, dedicated conveyor belt system.

The proposed King 2 East (K2E) Project extension will ensure an ongoing, secure supply of coal for the Tarong power stations, helping Stanwell maintain reliable electricity generation for Queensland.

The project will expand Meandu Mine’s surface rights area by approximately 187 hectares, a 7% increase in total operational land area, all within the mining lease boundary.

Stanwell is progressing regulatory approvals with the goal of commencing mining in the K2E Project area in 2026.

Owners

SourceSource
CompanyInterestOwnership
Stanwell Corporation Limited 100 % Indirect
TEC Coal Pty Ltd, a wholly owned subsidiary of Stanwell Corporation Limited, owns the Meandu Mine.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The Meandu Mine is in Late Triassic Tarong beds (the host unit for the coal seams mined at Meandu Mine). Mining Lease (ML) 6674 overlies part of the Triassic-aged Tarong Basin, a north north-west/south south-east trending elongate pull-apart basin. In the area of the Meandu Mine the maximum width of the Tarong Basin is in the order of 9 to 10 km.

Meandu Mine is located near the centre of the Tarong Basin, which has been interpreted by Flood and Garces (1986) to be formed by a dextral, strike-slip, pull-apart mechanism. Within and surrounding the Meandu Mine, areas of the Triassic sediments have been overlain by Tertiary Main Range Volcanics and thin layers of Quaternary surface sediments that are restricted to the existing drainage lines.

The stratigraphic sequence underlying the K2E ASA is generally the same as that encountered at the Meandu Mine. Geology at Meandu Mine comprises (from the surface downwards): Quaternary alluvium, Tertiary basalt, spoil, regolith and upper Triassic coal measures (the Tarong beds) with sandstone/siltstone between the coal seams.

Coal seams
The coal seams at Meandu Mine generally dip gently to the south and south-east at less than five degrees from horizontal. The seam sequence (top down) in the Meandu deposit is:
• Ace Seam;
• King Seam, commencing at a depth of 20 to 60 m below the Ace Seam;
• Queen Group (A to J Seams) subdivided as Queen Upper and Lower Seam packages with Queen Upper commencing from a further 30 to 50 m below the King Seam;
• coal seams below the Queen Seams, which are not mined at site (including Joker, Prince, Baron, Duke and Duchess (followed by a set of inconsistent low-quality plies at greater depth).

Main faults, typically trending parallel to the long-axis of the Tarong Basin, occur along the eastern margin of the basin disrupting the continuity of coal seams within ML6674. Vertical throws have been interpreted up to 80 m in height.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits2025202420232022202120202019201820172016
Coal (thermal) t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe5,809,5916,005,9355,573,8194,265,614
All production numbers are expressed as clean coal.

Operational metrics

Metrics2025202420232022202120202019201820172016
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe7,961,919 t8,132,043 t7,814,977 t5,874,786 t
Raw coal annual capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe7,685,272 t7,698,586 t7,447,020 t5,243,284 t
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 11, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 11, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 11, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 11, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 11, 2025

Workforce

Total WorkforceYear
...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017

Aerial view:

Lock

- subscription is required.