Mining Intelligence and News
Brazil

Boa Vista Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Niobium
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotBoa Vista (Niobium) Mine in Brazil is the world’s second largest niobium mine.

Niobium ore is sourced from three pits over the mine life, these include the Boa Vista, Mina I, and Mina II. Mina I and Mina II are located within the Chapadão final pit design.

During 2023 next activities were completed at the Boa Vista Mine: the transformation of drainage system, increasing the pumping capacity while deepening the pit; the construction of new sumps with a capacity of approximately 22,000 cubic meters to ensure the dust-proof water during the drought period annually.

Owners

SourceSource
CompanyInterestOwnership
CMOC Group Ltd. 100 % Indirect
The CMOC Group Ltd. indirectly owns 100% equity interests in the Boa Vista mine through its subsidiary CMOC Brasil Mineração Indústria e Participações Ltda.

Contractors

Lock

- subscription is required.

Deposit type

  • Breccia pipe / Stockwork
  • Vein / narrow vein

Summary:

Two significant niobium deposits have been defined to date and are named Boa Vista and Morro de Padre deposits. These deposits are hosts by igneous rocks which occur as swarms of thin dikes, forming a stockwork of crosscutting dikes in the upper zone and varying to individual mineralised thicker dikes at depth.

Niobium mineralisation is associated with nelsonite vein which vary in thickness and orientation forming stock work style deposits. Containing magnetite-apatite-carbonate composition economic mineralisation is exclusively associated with the mineral pyrochlore. The nelsonite veins are hosted within a variety of pre-existing lithologies including amphibolite and fenite, a metasomatically altered rock believed to originally comprise phyllite. Phlogopite alteration may also be associated with the carbonatite veins, where it commonly occurs as haloes surrounding the veins and overprinting the fenite. To a lesser extent phlogopite occurs as selvages to the nelsonite veins.

Both the Boa Vista and Morro de Padre deposits occur as pipe-like bodies consisting of sub vertical major feeder structures that permit vertical passage of the deep-seated carbonatite magmas to shallower depths where the dykes split into a complex stockwork of veins and veinlets. The stockwork zones are approximately 270m (N-S) by 350m (E-W) and are considered to be a result of magma degassing in response to reducing confining pressures and the formation of multiple sets of tensional fractures by the expanding gas exsolving from the ascending magma. A direct consequence of this model is the higher density of veins close to the central feeder zones, with decreasing vein abundance with increasing distance from the feeder zones. The vertical extent over which niobium mineralisation has been identified to a depth approximately 600m, however the drilling density is significantly higher in Boa Vista.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024202320222021202020192018201720162015
Niobium t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe7,489 8,957 8,674 6,259 6,300 
All production numbers are expressed as metal in alloy. ^ Guidance / Forecast.

Operational metrics

Metrics20232022202120202019201820172016
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe3,190 kt
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2.09 Mt2.27 Mt
Annual mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe14 Mt
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe3.1 Mt

Production Costs

Commodity production costs have not been reported.

Financials

Units2023202220212017
Capital expenditures M USD
Revenue M RMB  ....  Subscribe  ....  Subscribe  ....  Subscribe 1,670  
Operating Income M RMB 151.3  
Pre-tax Income M RMB 151.3  
After-tax Income M RMB 149.2  
EBIT M USD
EBITDA M USD

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 16, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 16, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 16, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2015

Aerial view:

Lock

- subscription is required.