North Queensland Copper Operation

Click for more information

Categories

Summary

Mine TypeUnderground
StatusCare and Maintenance
Commodities
  • Copper
  • Gold
  • Silver
Mining Method
  • Avoca
  • Longhole open stoping
  • Bench stoping
Production Start... Lock
SnapshotNorth Queensland Copper Operations include the Mt Colin copper mine, the Barbara copper/gold project, and a prospective tenement package in the Mount Isa/Cloncurry region.

Mining was completed in November 2024. Final stockpiled material processing was completed during the March 2025 and Mt Colin operations moved into care and maintenance.

At North Queensland Operations, mining at Mt Colin concluded, and Aeris began infrastructure removal and preparatory rehabilitation work.

The feasibility study on the Barbara Project in North Queensland was completed during the FY2025. While Barbara would contribute additional copper production, the project does not meet Aeris’ strategic requirements.

The North Queensland assets including the Barbara Project and exploration tenements have been deemed non-core and options for divestment are being pursued.
Related Asset

Owners

SourceSource
CompanyInterestOwnership
Aeris Resources Ltd. 100 % Indirect
North Queensland Copper Operations were acquired in July 2022 through the acquisition of Round Oak Minerals Limited.

Deposit type

  • ISCG

Summary:

North Queensland Operations includes three deposits, Mt Colin, Barbara and Lillymay.

The North Queensland Project are associated with shear-hosted copper/gold deposits. The deposit dimensions range between a strike length of 400m to 700m, with down dip extensions of 700m to 900m. Average deposit widths range from 2m to 5m.

Mt Colin
The deposit is considered an ISCG (iron sulphide copper gold) mineralisation style.

The deposit strikes approximately 295o (MGA), and dips approximately 75o NNE. It is hosted by metasomatised calc-silicates of the Corella Formation (1750-1738Ma), at surface, and by the Wonga-suite Burstall Granite (1745-1726Ma) at depth.

Mineralisation principally controlled and essentially contained within the WNW-ESE striking planar Mt Colin fault. The broad-scale geology appears relatively simple and straightforward.

The mineralised zone is dominated by pyrrhotite gangue to the east, and carbonate dominated gangue to the west.

Known extent of +1.5% Cu mineralisation is approximately 400m in strike length, 500m down-dip, and up to ~10m in true width. The Mineral Resource extends to these limits.

Barbara
The deposit can be broken into main areas North, Central and South. Southern Lode of Barbara mineralization (+0.5% Cu) extends for approximately 230m in strike length (local N-S), averaging approximately 15m in true width (between 1m to >25m).

The dimensions of the deposit overall are ~700m strike length, ~400m vertical extent in the deepest southern part, up to 30m horizontal width and 60° dip to the southwest.

Lillymay
Copper mineralisation at Lilly May exists as chalcopyrite hosted in a 1-4 m wide quartz vein with strong chlorite alteration and smaller subsidiary veins and alteration in the surrounding 1 – 4 m. Chalcopyrite occurs in massive irregular bunches, stringers and veins. The vein strikes E-W (070-090) and dips at around 60-70° to the south. It is slightly curved along strike and convex to the south.

The Inferred Resource outcrops at surface and has been defined over a strike length of 400m, and down-dip for 140m. The larger E Lode is approximately 250m in strike length, separated from the 100m W lode by a 50m sub-grade zone. Resource widths vary from <1m to ~5m in true width.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Water usage

Parameter20242023
Groundwater 47.5 ML43.8 ML
Third-party water 52.4 ML
Surface water 70.9 ML

Commodity Production

Underground mining at Mt Colin was completed in November 2024, with final ore stockpiles processed at Ernest Henry by end of March 2025.
CommodityProductUnits20252024202320222021
Copper Metal in concentrate t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Gold Metal in concentrate oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Concentrate kt  ....  Subscribe
Silver Metal in concentrate oz  ....  Subscribe

Operational metrics

Metrics2025202420232021
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

CommodityUnits202520242023
All-in sustaining costs (AISC) Copper AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
All-in costs Copper AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
** Net of By-Product.

Mine Financials

Units202520242023
Sustaining costs M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Capital expenditures M AUD  ....  Subscribe  ....  Subscribe
Revenue M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
EBITDA M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 28, 2025
....................... Subscription required ....................... Subscription required Subscription required Oct 28, 2025

Workforce

ContractorsYear
...... Subscription required 2022

Aerial view:

Lock

- subscription is required.