Mining Intelligence and News
South Africa

Arnot Mine

Click for more information

Categories

Overview

Mine TypeUnderground
StatusCare and Maintenance
Commodities
  • Coal (thermal)
Mining Method
  • Bord-and-pillar
  • Continuous
Production Start... Lock
SnapshotArnot Mine commenced production activities in February 2022, but in October 2022, Salungano had made the decision to place Arnot OpCo into business rescue. The current position of Arnot is entering Care and Maintenance.

Salungano Group is under suspension from trading the shares on the JSE Limited, which came into effect on 21 August 2023. The delay in the finalisation and publication of the financial results relates to the finalisation of the Salungano’s refinancing agreements.

The FY2024 interim financial results are now planned to be released on or about 31 October 2024 and it is the Salungano’s intention to release the FY2024 financial results as soon as possible thereafter. It is therefore currently the Board’s best estimate that the Suspension will be lifted on or about 31 January 2025.

Owners

SourceSource
CompanyInterestOwnership
Salungano Group Ltd. 50 % Indirect
Investco Properties Limited 50 % Indirect
Salungano Group Ltd., through Wescoal Mining Proprietary Limited, holds a 50% shareholding interest in Arnot OpCo Proprietary Limited (“AOC”).

The Arnot group is 50% owned by Wescoal Mining Proprietary Limited and 50% owned by InvestCo Proprietary Limited.

Wescoal Mining Proprietary Limited is subsidiary of Salungano Group Ltd.

Deposit type

  • Sedimentary

Summary:

No 1 Seam
The S1 is consistently developed in the western half of the Arnot Project area, while in the eastern portion it only occurs as isolated patches. It is intersected at an average depth of more than 50 m in the underground extents, rendering it not feasible for exploitation in these areas. It does occur at shallower depths of at least 23 m in the opencast areas and remains a good prospect in these resource areas. It is, however, patchily distributed. Where present it is generally 1.2 m thick and consists of a hard, good quality mixed bright and dull banded coal, an average in situ Calorific Value (“CV”) of 25 MJ/kg on an air-dried basis (“adb”).

The inter-seam parting between the S1 and S2 consists of a grey micaceous mudstone unit that is usually between 0.7 m to 1.5 m in thickness, which increases up to 5 m at the fringes of the S1 outcrop area.

No 2 Seam
The S2 is site-specifically subdivided into the Seam 2 Lower (“S2L”), Seam 2 Upper (“S2U”) and Seam 2A (“S2A”) marked by two intra-seam partings, namely parting P2 and P3, respectively. The S2L constitutes the majority of the coal resources in the Arnot area and consists of hard, dull to lustrous coal with several bright coal bands and occasional stone partings. It has a CV of between 22.83 - 23.80 MJ/kg in the underground resource area and between 24.06-24.46 MJ/kg in the opencast resource area.

The S2L is continuous across the Arnot Project. The depth to the top of the S2L depends largely on local surface topography and reaches a maximum depth of 80 m along the eastern boundary of the Project area, pinching and thinning out in the eastern parts of the mining section due to local, pre-Karoo basement palaeo-highs.

No 4 Seam
The S4 occurs erratically across the lease area with an average thickness of 0.7 m. The seam is often split by internal clastic partings into Seam 4 Lower (“S4L”) and Seam 4 Upper (“S4U”). The No. 4 Seam is overlain by interlaminated units of siltstone and shale with the S5 sporadically developed in areas. Neither the S4 nor S5 are included in the coal resource estimates.

Structure and Intrusions
A well-developed dolerite sill is present some 15m–20m above the S2L in the topographically elevated areas in the south-eastern portion of the Arnot Project area. This sill is between 5m–40m thick, with an average of approximately 11 m, and has resulted in devolatilisation and minor resource loss where the volatile matter dropped below 18%. Feeder dykes are expected to occur in the vicinity of the sill. A number of dolerite dykes are also known to have intruded the Karoo Supergroup succession in the area, with six dykes having been intersected in the underground workings to date. The dykes often lack magnetic signature and are not responsive to geophysical methods of detection.

Faults with displacement in excess of 2.5 m are rare and to date only six have been encountered in the underground mine (Sambo and van der Merwe, 2015). A high density of compactional structures (i.e. slips and faults), however, occur in zones adjacent to pre-Karoo palaeo-highs. Similar features are observed on the flanks of relatively large floor rolls, scour and dome structures. The aforementioned geological structures have an adverse effect on underground coal-mine roof and strata-stability as they manifest into roof and side falls, caving of the roof and, more rarely, in subsidence of the ground surface.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

The position of Arnot entering Care and Maintenance.
CommodityUnits2015
All production numbers are expressed as clean coal.

Operational metrics

Metrics2023
Coal tonnes mined  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Financials

Units2023202220212020
Revenue M ZAR  ....  Subscribe  ....  Subscribe
Operating Income M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Pre-tax Income M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
After-tax Income M ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 30, 2024
....................... Subscription required ....................... Subscription required Subscription required Sep 30, 2024

Aerial view:

Lock

- subscription is required.