Overview

Mine TypeOpen Pit & Underground
StagePermitting
Commodities
  • Copper
  • Gold
  • Silver
Mining Method
  • Truck & Shovel / Loader
  • Sub-level open stoping (SLOS)
  • Longhole stoping
Backfill type ... Lock
Project Timeline... Lock
Mine Life... Lock
SnapshotThe Jervois Project is a high-grade copper reserve project with substantial silver and gold by-products, comprising the Reward, Rockface, Bellbird, and Marshall deposits.

The new Feasibility Study Update 2025 (FSU25) has optimized the mine plan and updated the capital and operating cost estimates.

KGL Resources is well positioned with all necessary approvals, to deliver its high-grade Jervois project into a copper market.

Owners

SourceSource
CompanyInterestOwnership
KGL Resources Limited 100 % Indirect
The Jervois Project is 100% owned by Jinka Minerals and operated by Jervois Operations Pty Ltd, both of which are wholly owned subsidiaries of KGL Resources Limited.

Contractors

Lock

- subscription is required.

Deposit type

  • Stratabound
  • Vein / narrow vein
  • Breccia pipe / Stockwork

Summary:

The Jervois project lies within the eastern part of the Arunta Region, which forms part of the North Australian Craton. Copper mineralisation at the project is hosted by a lower-to-middle amphibolite grade metasedimentary sequence of the Bonya Metamorphics.

The project area lies on the south-eastern edge of the Jervois Range. The proposed mining activity is focused along the range of low hills and rises running approximately north to south through the middle of the project area, forming a J-shape.

This distinctive J-shape of the Bonya Schist outcrop has been interpreted as the result of re-folding of pre-existing folds, and as a drag feature to a regional Jervois fault that lies to the west. The more resistant lithologies feature as a series of hills that prominently define the J-structure on aerial photographs and satellite images.

The mineralisation style is generally stratabound and contained within steeply dipping lenticular bodies (lodes). The mineralised sequence has a strike length of some 12km and a stratigraphic thickness up to about 600m.

Copper-gold-silver mineralisation mostly occurs as massive to semi-massive layers of sulphides. Sulphides also occur in associated quartz veins and as thin interlayers in meta-mudstone and calcsilicates.

The major mineral deposits in the Jervois Project area – Reward, Bellbird and Rockface – are generally sub-vertical strata-bound lodes that form a distinctive, kilometre-scale, J-fold within the host rock.

The geology, mineralisation and mineral Resources are focused on the copper-gold-silver (Cu-Au-Ag) Reward, Bellbird and Rockface deposits. Lead-zinc (Pb-Zn) mineralisation such as the Reward South deposit are not developed within the document.

At all three Cu-Au-Ag deposits, the mineralization is broadly similar, although each deposit differs in its detail, especially the local geological structures.

Mineralisation is hosted by various units of the Bonya Metamorphics, mostly occurring as massive to semi-massive layers of sulphides. Sulphides also occur as associated quartz veins and as thin interlayers in meta-mudstone and calc-silicates. The mineralisation typically consists of chalcopyrite and pyrite.

Alteration zones are associated with mineralisation and magnetite forms part of the alteration assemblage and is ubiquitous in the mineralized areas of Reward and Rockface, but less so at Bellbird. Sulphide textures vary from finely disseminated to stringers and veinlets to semi-massive.

The thickness of the mineralised zones vary extensively, from less than a meter to more than twenty meters.

Two main styles of mineralisation and alteration/metamorphic mineral assemblages are recognised as:
› Lower grade, primary syn-depositional or strata bound sulphides; and
› higher grade, structurally controlled shoots, representing both remobilised strata bound syngenetic mineralisation, and a possible late tectonic intrusion-related mineralising event.

Structurally controlled shoots are the result of reworked and remobilised primary strata-bound base metal mineralisation, during and after peak metamorphism, by granite intrusions. The shoots are observed as massive or semi-massive sulphide-magnetite veins and chalcopyrite-rich brecciated veins.

Oxidation due to surface weathering effects is relatively limited, with the oxidised zone being transitional from surface to base of oxidation (approximately 10-15 m below surface). No significant zone of complete oxidation can be delineated in the mineralisation.

Dimensions
The Reward deposits strike over 1.5 km. Within the structural corridor lie five high grade shoots each approximately 200m in length and plunge steeply south up to 800 m below the surface. Two lodes lie to the east in the footwall of the reward structure.

The Rockface deposits strike over 0.4 km. Within the hook of “J” structure, there are four defined lodes which range from 100 m to 300 m in length and plunge 900 m steeply to East.

The Bellbird deposits strike over 1.3 km. Within the structural corridor lie three defined lodes ranging from approximately 200 m to 500 m in length, and plunge moderately North. Three mineralised structures lie in the hanging wall position of the main structure and two oblique lodes lie to the east of the Bellbird structure.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnitsAvg. AnnualLOM
Copper Payable metal M lbs 564
Copper Metal in concentrate M lbs 56585
Copper Concentrate kt 983
Gold Payable metal koz 68
Gold Metal in concentrate koz 8.476
Silver Payable metal koz 8,497,400
Silver Metal in concentrate koz 1,0059,442,000

Production Costs

Commodity production costs have not been reported.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Sustaining CapEx $M AUD  ......  Subscribe
Working capital $M AUD  ......  Subscribe
OP OpEx $M AUD  ......  Subscribe
UG OpEx $M AUD  ......  Subscribe
Processing OpEx $M AUD 495
G&A costs $M AUD 94
Total OpEx $M AUD  ......  Subscribe
Net revenue (LOM) $M AUD  ......  Subscribe
EBITDA (LOM) $M AUD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M AUD  ......  Subscribe
After-tax Cash Flow (LOM) $M AUD  ......  Subscribe
Pre-tax NPV @ 8% $M AUD  ......  Subscribe
After-tax NPV @ 8% $M AUD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 5, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 5, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 5, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 5, 2025

Workforce

Total WorkforceYear
...... Subscription required 2025
...... Subscription required 2022

Aerial view:

Lock

- subscription is required.