Summary

Mine TypeOpen Pit
StatusCare and Maintenance
Commodities
  • Nickel
  • Copper
  • Cobalt
  • PGM
  • 4E (Pt, Pd, Rh, Au)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotNkomati Mine is an operation comprising a known nickel sulphide orebody, established infrastructure and a chrome-washing plant used to process existing stockpiles. This is South Africa’s only proven primary nickel resource. The operation has been on care and maintenance since 2021. A sale agreement concluded in 2023 for the transfer of a 50% participation interest reached final completion in July 2025, and all conditions precedent were fulfilled.

Progress in the 2025 year includes recommissioning of the chrome-washing plant to generate early revenue and expenditure on a water-treatment plant that contributed to a reduction in estimated undiscounted rehabilitation liabilities. Estimated rehabilitation costs continue to be reassessed as engineering designs evolve.

Owners

SourceSource
CompanyInterestOwnership
African Rainbow Minerals Ltd. 100 % Indirect
Following a sale agreement concluded in November 2023, African Rainbow Minerals Ltd. (ARM) completed the acquisition of Norilsk Nickel Africa’s 50% participation interest on 31 July 2025, consolidating full ownership of Nkomati Nickel Mine. Norilsk Nickel Africa (Pty) Ltd no longer has any role in the business or its governance and decision-making structures.

Deposit type

  • Magmatic

Summary:

Sulphide and chromite mineralisation occurs within the Uitkomst Complex, a Bushveld-age, layered, mafic-ultramafic intrusion, which concordantly intrudes dolomite/chert of the Malmani Subgroup and shales/quartzites of the Timeball Hill Formation. The Uitkomst Complex, which lies unconformably on an Archaean basement, is a north-west/south-east tubular shaped body which outcrops in the Slaaihoek Valley for approximately 9 kilometres before dipping at 4º below an escarpment where it has been drilled down-dip for another 4 kilometres and is still open-ended to the north west.

From the base to top, the stratigraphy of the Uitkomst Complex comprises the Basal Gabbro Unit (up to 15 metres thick), the Lower Pyroxenite Unit (average 35 metres), the Chromititic Peridotite Unit (30 to 60 metres), the Massive Chromitite Unit (up to 10 metres), the Peridotite Unit (330 metres), the Upper Pyroxenite Unit (65 metres), the Gabbronorite Unit (250 metres), and the Upper Gabbro Unit (50 metres). The complex and surrounding sediments are intruded by numerous diabase sills up to 30 metres in thickness.

Apart from the now mined-out Massive Sulphide Body (MSB), situated at and below the base of the Uitkomst Complex, there are three main economic sulphide mineralised zones:
-The Basal Mineralised Zone (BMZ) within the Basal Gabbro;
-The Main Mineralised Zone (MMZ) occurring within the Lower Pyroxenite Unit;
-The Chromititic Peridotite Mineralised Zone (PCMZ) which occurs with the Chromititic Peridotite (PCR).

In addition, the Peridotite Unit contains the Peridotite Mineralised Zone (PRDMZ) which is a low-grade disseminated sulphide mineralisation zone not yet included in the mine’s resource base. The dominant sulphide minerals are pyrrhotite, pentlandite and chalcopyrite. Cobalt is mostly in solid solution in the pentlandite, and the platinum group metals (PGMs) occur as separate minerals, with merenskyite being dominant. The current mined chromite is contained within the Massive Chromitite Unit (MCHR) in the open-pit area.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits2021202020192018201720162015
Nickel t  ....  Subscribe  ....  Subscribe14,20913,30215,87521,59221,298
Copper t  ....  Subscribe  ....  Subscribe7,1637,3717,6379,8939,666
Cobalt t  ....  Subscribe  ....  Subscribe8207168131,0651,116
PGM oz  ....  Subscribe  ....  Subscribe109,496110,290123,745157,598144,368
All production numbers are expressed as metal in concentrate.

Operational metrics

Metrics2021202020192018201720162015
Ore tonnes mined  ....  Subscribe  ....  Subscribe7.09 Mt5.9 Mt5.2 Mt7.61 Mt7.35 Mt
Tonnes milled  ....  Subscribe  ....  Subscribe8.15 Mt8.04 Mt7.49 Mt8.24 Mt8.03 Mt

Production Costs

CommodityUnits20212020201920182017
C1 cash costs Nickel USD  ....  Subscribe  ....  Subscribe 6.47 / lb **   5.86 / lb **   4.81 / lb **  
** Net of By-Product.

Operating Costs

Currency202120202019201820172016
Total operating costs ($/t milled) ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Mine Financials

Units20212020201920182017
Capital expenditures M ZAR 336   428   718  
Revenue M ZAR  ....  Subscribe  ....  Subscribe 3,046   3,278   3,991  
Operating Income M ZAR  ....  Subscribe  ....  Subscribe -97   494   660  
After-tax Income M ZAR  ....  Subscribe  ....  Subscribe -2,770   20   -1,240  
EBITDA M ZAR  ....  Subscribe  ....  Subscribe -482   360   618  
Operating Cash Flow M ZAR  ....  Subscribe  ....  Subscribe -172   542   566  

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 21, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2025
...... Subscription required ...... Subscription required ...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017
...... Subscription required ...... Subscription required ...... Subscription required 2016
...... Subscription required ...... Subscription required ...... Subscription required 2015
...... Subscription required ...... Subscription required ...... Subscription required 2014
...... Subscription required ...... Subscription required ...... Subscription required 2013

Aerial view:

Lock

- subscription is required.