Mining Intelligence and News
South Africa

Grootegeluk Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
  • Coal (metallurgical)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Grootegeluk complex is one of the largest integrated mining and beneficiation operations globally, running the largest coal beneficiation complex, and the only producing mine in the coalrich Waterberg, adjacent to Eskom’s Matimba and Medupi power stations.

The optimization of the use of the installed capacity is a continuous process at the Grootegeluk complex, and there are projects on the relocation of the in-pit crusher and a study on the efficient and effective management of the Grootegeluk trucks and shovels.

Owners

SourceSource
CompanyInterestOwnership
Exxaro Resources Ltd. 100 % Indirect
Grootegeluk mine 100% attributed to Exxaro Resources Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

Grootegeluk is located in the Waterberg coalfield and the coal seams are from the Volksrust and Vryheid formations.

The upper part of the coal deposit, the Volksrust Formation (approximately 60m thick) is classified as a thick interbedded seam deposit type, comprising intercalated mudstone or carbonaceous shale and bright coal layers. The Vryheid Formation (approximately 55m thick) forms the lower part of the coal deposit and comprises carbonaceous shale and sandstone with interbedded dull coal seams varying in thickness from 1.5m to 9m. It is therefore classified as a multiple seam deposit type.

These coal seams are subdivided into 11 coal zones, further divided into separate coal and non-coal samples for analysis. A total of 77 samples are analysed per full succession drill hole. The Volksrust Formation consists of 30 coal samples and 30 non-coal samples whereas the Vryheid Formation consists of 13 coal samples and four non-coal samples.

The Zoetfontein fault forms the boundary of the Waterberg coalfield in the north and the Eenzaamheid fault forms the boundary in the south. The Daarby fault, with a throw of some 350m, divides the coalfield into a deep north-eastern portion and a shallow south-western portion. On average, the first fresh coal in the shallow south-western portion is 20m below surface. The lowermost coal seam (Zone 1) occurs at a depth of about 130m in the shallow portion of the coalfield, but this may vary depending on the local structure. The predominantly horizontal coal-bearing formations have a very gentle dip to the south-east near Grootegeluk. Only a few dolerite dykes outcrop in the south-eastern portion of the Waterberg coalfield, and no sills have been encountered in any exploration drill holes drilled in the mining right area to date.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024202320222021202020192018201720162015
Coal (thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe26 27 23 21 22 
Coal (metallurgical) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2.1 2.3 2.1 1.9 
All production numbers are expressed as clean coal. ^ Guidance / Forecast.

Operational metrics

Metrics202320222021202020192018201720162015
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe56.2 Mt57.2 Mt51.4 Mt43.7 Mt45.3 Mt

Production Costs

Commodity production costs have not been reported.

Financials

Units2020
Sustaining costs M ZAR  ....  Subscribe

Heavy Mobile Equipment

Lock

- subscription is required.


AV - Autonomous

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 15, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 15, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 15, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 15, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 15, 2024

EmployeesYear
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2019

Aerial view:

Lock

- subscription is required.