Mining Intelligence and News
South Africa

Kliprand Colliery Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotIkwezi mining (PTY) Ltd is private coal mining company which runs the Kliprand Colliery Bituminous mine and Emoyeni coal beneficiation plant in Dannhauser.

ASX has reviewed Ikwezi Mining's in-principle application for delisting of its ordinary shares and accordingly a market announcement was made by Ikwezi Mining on 25 October 2022, after obtaining the requisite ASX in-principle decision.

Operating results have not been available since then.

Owners

SourceSource
CompanyInterestOwnership
Oza Holdings Indirect
BEE Ikwezi Holdings (Pty) Ltd. Indirect
Ikwezi Mining (Pty) Ltd. 100 % Direct
As of July 2025, Ikwezi mining (PTY) Ltd runs the Kliprand Colliery and Emoyeni coal beneficiation plant in Dannhauser.

Ikwezi Mining forms part of Oza Holdings.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The Kliprand Colliery is an opencast operation, in the Klip River Coalfield of KwaZuluNatal.

Faulting in the area is known to have disturbed the coal horisons by, in some cases, over 137m in the vertical plane. Two economic seams are present, namely the Top Seam (0.5 to 3.3m thick) of bright coal and the Bottom Seam (0.5 to 1.3m thick) with comparatively less coa. Although the quality varies across the seams they both yield a generally high grade product with ranks from bituminous coal to anthracite. The best quality coals are produced in the central part of the field, with qualities decreasing and seams thinning to the north and south. Devolatilization of the coal by doleritic intrusion has caused the formation of lean coal and anthracite for domestic use. Methane gas trapped within fissures associated with dyke intrusions can be hazardous.

The Top Seam is often considered the correlation of the Alfred Seam within the Utrecht and Vryheid Coalfields. Similarly the Bottom Seam is considered the equivalent of the Gus Seam.

The roof and floor conditions of the seams are variable across their extent, consisting of sandstone and shale. The seams are separated by coarse-grained cross-bedded sandstone that fines up to carbonaceous shale. This forms a competent (strata or rock structure combining sufficient firmness and flexibility to transmit pressure, and by flexure under thrust, to lift a superincumbent load*) roof to the bottom seam while the roof of the Top Seam is considerably weaker and composed of micaceous sandy shale. Floors of both seams are composed of incompetent (applied to strata, a formation or a rock structure not combining sufficient firmness and flexibility to transmit a thrust and to lift a load by bending ) micaceous or sandy shale.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

Ikwezi Mining did not provide Production information for the full 2022. Operational highlights of the year:
- 94 614 tons of ROM coal produced in June 2022 from both pits;
- 556 671 cubic meters of total mining in June 2022 from both pit;
- 93 136 of ROM coal feed tons processed in January 2022.
CommodityUnits202120202019
Coal (thermal) t  ....  Subscribe  ....  Subscribe181,299
All production numbers are expressed as ROM coal.

Operational metrics

Metrics20222021
Coal washing plant annual capacity  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Mine Financials

Units2022202120202019
Revenue M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe 5  
Gross profit M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe 1.8  
Pre-tax Income M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
After-tax Income M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Operating Cash Flow M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe -0.7  

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 19, 2025

Workforce

Aerial view:

Lock

- subscription is required.