Mining Intelligence and News
Bosnia and Herzegovina

Omarska(Ljubija) Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Omaska property consists of the Omarska and Ljubija mines and the Zenica steel plant.

Owners

SourceSource
CompanyInterestOwnership
RZR Ljubija a.d. Prijedor 49 % Indirect
ArcelorMittal SA 51 % Indirect
ArcelorMittal Prijedor (operator) 100 % Direct
The Omarska mine is operated by ArcelorMittal Prijedor. ArcelorMittal Prijedor was founded in 2004 as a partnership between ArcelorMittal (at the time LNM Holdings) with a 51% controlling interest and local mining company Iron Ore Mine Ljubija owning the remaining 49% stake. ArcelorMittal Prijedor is a captive mine of the Europe segment and supplies all of its iron ore production to the ArcelorMittal Zenica steel plant.

Contractors

Lock

- subscription is required.

Deposit type

  • Hydrothermal
  • Banded iron formation

Summary:

The Omarska deposit was originally comprised out of three ore bodies: Jezero, Buvac and a small ore body known as Mamuze. Ore reserves from Jezero and Mamuze have already been fully excavated. Since 2011, only the Buvac pit is in operation. It is formed within a carboniferous clastic and carbonate sediments. The genesis of this deposit is attributed to hydrothermal replacement and syn-sedimentary processes. The ore body is mainly composed of limonite-goethite mineralization, which was formed during weathering and oxidization of the primary siderite bodies.

The Buvac deposit at Omarska mine is located within Carboniferous clastic (shale and sandstones) and carbonate (limestone, dolomite, and ankerite) sequences, with massive siderite-limonite mineralization forming an integral part of the formation. Iron ore from the Buvac deposit is predominantly limonite-goethite with associated quartz, carbonates, and silicates of the illite type. The limonite-goethite mineralization was formed during the oxidization of the upper parts of the primary siderite bodies.

The ore body is asymmetrical, lens-shape and elongated in a northeast - southwest direction, dipping at about 8° toward the north-east from the surface to a depth of 210 meters. The deposit is approximately 1.5 kilometer long and 1.0 kilometer wide.

The Ljubija deposit is located within Carboniferous and Permian-Triassic formation rocks which are partly covered by thin Quaternary rocks. The ore within these formations is primarily composed of siderite and ankerite with secondary limonite iron facies.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits202420232022202120202019201820172016
Iron Ore Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.51.41.61.8
All production numbers are expressed as concentrate & lump.

Operational metrics

Metrics202420232022202120202019201820172016
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.9 Mt1.9 Mt2.2 Mt2.3 Mt

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 19, 2025

Workforce

EmployeesYear
...... Subscription required 2022
...... Subscription required 2020

Aerial view:

Lock

- subscription is required.