Mining Intelligence and News
Bosnia and Herzegovina

Omarska(Ljubija) Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotIn 2022, ArcelorMittal Prijedor acquired additional mining and land rights and started iron ore mining on a trial basis at Ljubija Mine with a plan for full production to be reached in 2025. Product from Ljubija mine is blended with the product from Omarska mine and is supplied to ArcelorMittal Zenica steel plant.

Owners

SourceSource
CompanyInterestOwnership
RZR Ljubija a.d. Prijedor 49 % Indirect
ArcelorMittal SA 51 % Indirect
ArcelorMittal Prijedor (operator) 100 % Direct
The Omarska mine is a production stage surface iron ore mine in Bosnia and Herzegovina, operated by ArcelorMittal Prijedor.

The mine is a joint venture in which ArcelorMittal owns 51% and the other 49% is owned by the local iron ore mine Ljubija.

Contractors

Lock

- subscription is required.

Deposit type

  • Hydrothermal
  • Banded iron formation

Summary:

The Omarska deposit was originally comprised out of three ore bodies: Jezero, Buvac and a small ore body known as Mamuze. Ore reserves from Jezero and Mamuze have already been fully excavated. Since 2011, only the Buvac pit is in operation. It is formed within a carboniferous clastic and carbonate sediments. The genesis of this deposit is attributed to hydrothermal replacement and syn-sedimentary processes. The ore body is mainly composed of limonite-goethite mineralization, which was formed during weathering and oxidization of the primary siderite bodies. The Buvac deposit at Omarska mine is located within Carboniferous clastic (shale and sandstones) and carbonate (limestone, dolomite, and ankerite) sequences, with massive siderite-limonite mineralization forming an integral part of the formation. Iron ore from the Buvac deposit is predominantly limonite-goethite with associated quartz, carbonates, and silicates of the illite type. The limonite-goethite mineralization was formed during the oxidization of the upper parts of the primary siderite bodies. The ore body is asymmetrical, lens-shape and elongated in a northeast - southwest direction, dipping at about 8° toward the north-east from the surface to a depth of 210 meters. The deposit is approximately 1.5 kilometer long and 1.0 kilometer wide. The Ljubija deposit is located within Carboniferous and Permian-Triassic formation rocks which are partly covered by thin Quaternary rocks. The ore within these formations is primarily composed of siderite and ankerite with secondary limonite iron facies.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits20232022202120202019201820172016
Iron Ore Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.51.41.61.8
All production numbers are expressed as concentrate & lump.

Operational metrics

Metrics20232022202120202019201820172016
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.9 Mt1.9 Mt2.2 Mt2.3 Mt

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024

EmployeesYear
...... Subscription required 2022
...... Subscription required 2020

Aerial view:

Lock

- subscription is required.