Mining Intelligence and News
Peru

Carahuacra Norte Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusInactive / Suspended
Commodities
  • Zinc
  • Lead
  • Copper
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotThe Carahuacra Norte pit is part of the Yauli operating unit.

The Carahuacra Norte pit has been paralyzed since 2018; Conceptual studies are being carried out for the tailings deposit.

Owners

SourceSource
CompanyInterestOwnership
Glencore plc. 23.3 % Indirect
Volcan Compañía Minera S.A.A. is a subsidiary of Glencore AG, which is a subsidiary of Glencore Plc., owner of 63% of common class A voting shares and an economic interest of 23%, excluding treasury shares.

Volcan Compañía Minera S.A.A. and its subsidiary companies engaged in the mining sector operate the mining unit of Yauli, which includes the Carahuacra Norte open pit mine.

In Q4 2022, Glencore commenced a process to dispose of its 23.3% economic interest in Volcan, which is ongoing. As a result, the carrying amounts of Volcan assets and liabilities as at 31 December 2023 and 31 December 2022 are classified as held for sale.

Deposit type

  • Vein / narrow vein

Summary:

The Carahuacra deposit lies on the southwest flank of the Yauli anticline, formed by Tertiary folding. Manto ore, formed before the climax of the Andean orogeny, consists mainly of ferroan sphalerite and pyrite, with negligible chalcopyrite. These were later brecciated tectonically to form two zones of 'breccia ore'. The last phase of mineralization involved formation of epithermal cross veins with sphalerite, pyrite, galena, tetrahedrite, and jamesonite, and irregular cementation of fragments in the breccia ore by sphalerite-galena and pyrite-marcasite. Supergene alteration, particularly pronounced in the breccia zone, has formed ore much enriched in silver (native silver, argentite, pyrargyrite).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

Combined production numbers are reported under Yauli Operation

Operational metrics

Metrics2018201720162015
Tonnes processed 44 kt105 kt273 kt369 kt
Daily ore mining rate

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 13, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 13, 2024

Aerial view:

Lock

- subscription is required.