Summary

Mine TypeUnderground
Study CompletedFeasibility
StageConstruction
Commodities
  • Copper
  • Cobalt
Mining Method
  • Longhole open stoping
  • Cut & Fill
  • Post Pillar Cut & Fill
Mine Life... Lock
SnapshotThe Musonoi Project is an advanced brownfield copper–cobalt development and one of the highest-grade cobalt deposits globally.

As of 2024, Musonoi remained in the construction phase, progressing on schedule, with major underground works including a main decline ramp, a multi-purpose vertical shaft, and three ventilation shafts. The processing plant has been completed, and the Musonoi power project was commissioned by SNEL in February 2022.

Jinchuan Group International Resources also advanced deep-processing plans, with ENFI completing a feasibility study in 2023 and a revised study incorporating the new facilities finalized in mid-2023.

In April 2025, Jinchuan Group announced a delay in publishing its FY2024 results due to additional work required at subsidiary Ruashi Mining SAS. The most recent operational data available covers the first half of 2024.

Owners

SourceSource
CompanyInterestOwnership
Gécamines S.A 25 % Indirect
Jinchuan Group International Resources Co. Ltd. 75 % Indirect
Ruashi SAS is an indirect subsidiary of the Jinchuan Group. Ruashi SAS is held as to 75% thereof by Ruashi Holdings (Proprietary) Limited, a wholly-owned subsidiary of the Jinchuan Group, and the remaining 25% interest thereof is owned by Gécamines SA.

Contractors

Lock

- subscription is required.

Deposit type

  • Sediment-hosted
  • Breccia pipe / Stockwork

Summary:

A strike length of 600 m to 700 m has been identified with the deepest drill intersection obtained being 550 m below surface. Mineralisation remains open ended at depth. The mineralisation is typical of that of the Kamoto and KOV Mines with two HG zones.

The mineralised zones consist of talc shales, breccias and siltstones forming part of the meta sedimentary sequence. Copper and cobalt mineralisation is generally in the form of malachite and heterogenite/kolwezite in the oxide portion of the deposit and chalcocite, bornite and carrollite in the deeper sulphide zone. The depth of oxidation is approximately 190 m to 220 m below surface.

The ore body is open ended to depth and no flattening of the dip indicating proximity of the fold closure has been intersected thus far. The solids modelling was extrapolated 50 m east and west of the last drill hole intersection (along strike), and 50 m beyond the last drill hole intersection to depth (down dip).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. Annual
Copper Cathode t 38,000 *
Cobalt Metal in hydroxide t 7,400 *
* According to 2018 study.

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 26, 2025

Workforce

Aerial view:

Lock

- subscription is required.