Overview

Mine TypeUnderground
StatusActive
Commodities
  • Chrome
Mining Method
  • Bench stoping
  • Sub-level stoping
  • Sub-level caving
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotMine in Kemi is the only chrome mine in the European Union (EU). The Ferrochrome business area has a chrome mine in Kemi and ferrochrome smelters in Tornio. Ferrochrome produces charge grade of ferrochrome.

During 2023, Outokumpu completed the significant project deepening the Kemi underground mine from 500 meters to 1,000 meters.

Kemi mine to become the first carbon-neutral mine in the world by 2025. The three key factors in the Kemi mine’s carbon neutrality are shifting from fossil fuels to renewables, utilizing low-carbon electricity, and replacing natural and propane gas in heating.

The mine uses Neste MY Renewable Diesel, made from 100% renewable raw materials, to replace fossil fuels in machinery and transport between the mine and the Tornio mill. The goal is for the entire fleet at Kemi and Tornio to switch to renewable diesel.

Owners

SourceSource
CompanyInterestOwnership
Outokumpu Oyj 100 % Indirect
Outokumpu Chrome Oy (operator) 100 % Direct
Outokumpu owns and operates a chrome mine in Kemi.

Contractors

Lock

- subscription is required.

Deposit type

  • Intrusion related

Summary:

Kemi mines chromite deposit is part of Kemi layered intrusion. According to Huhtelin (2015) in the central part of the intrusion the main chromite layers length is around 1,9 km and average thickness is 40 m, decreasing outward from the center. The intrusion is estimated to be 3-4 km deep according to the geophysical seismic reflection surveys.

The Kemi layered intrusion has a lenticular shape, that is around 0,2-2 km wide and 15 km long according to Huhtelin (2015). Tectonic movements have tilted the intrusion to dip about 70 degrees to the northwest. The intrusion was metamorphosed during the Svecokarelidec orogeny.

The chromite layer is mainly between metaperiodate layer on the hanging wall side and basalt contact series on the footwall side. The basalt series consist of mylonitic talc-chloritecarbonate schist, talc-carbonate rock, metapyroxenite and irregular concentrates of gabbro. The basement granitoid is in contact with the talc-carbonate rock.

The ore body has been fragmented into a group of smaller ore bodies. The main orebodies illustrated in are: in northern part Pohjois-Viia (PV), in the middle Elijärvi (EL), in the western part both Surmaoja (SO) and Nuottijärvi (NJ). Smaller ore bodies are Mätäsoja (MO) to southwest-, both Länsi-Viia- (LV) and Itä-Viia- (IV) between EL and PV. The last smaller ore body is Viianmaa/Perukka (VP) to northeast from the main ore bodies. (Huhtelin, 2015).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnits202320222021202020192018201720162015
Ferrochrome Alloy kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe505497415469457
Chrome Lump Mt 0.4 *
Chrome Concentrate kt 850 *
* Production numbers were reported as 'Average annual'

Operational metrics

Metrics2022202120202018
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe530,000 t of ferrochrome alloy
Annual mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe2.7 Mt of ore

Production Costs

Commodity production costs have not been reported.

Financials

Units2023202220212020201920182017
Capital expenditures M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 77   79   34  
Revenue M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 461   542   610  
EBIT M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 67   179   187  
EBITDA M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 96   210   217  

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jul 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 31, 2024

Total WorkforceYear
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017
...... Subscription required 2016
...... Subscription required 2015

Aerial view:

Lock

- subscription is required.