Mining Intelligence and News
Namibia

Husab Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Uranium
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Husab Uranium Mine, located near Swakopmund, is the second largest uranium producer in the world. The Mine represents China’s single largest investment in Africa.

In 2024, Husab Mine achieved remarkable milestones in production, with a new record of mined material (2% increase over the 2023 record). For the first time in Swakop Uranium’s history, the company recorded a profit.

In order to continue driving efficiency, innovation, and reducing risks, some innovative technologies were introduced in 2024. A real-time crusher blending application now allows seamless direct feeding from all three mining entities while maintaining feed grade and minimizing re-handling.

Swakop Uranium conducted extensive infill, resource, and exploration drilling in 2024 to the extent of 54,000 m drilled in order to enhance resource confidence and identify new targets. The accelerated exploration program is expected to yield over 100 000 m of drilling from 2025 onwards.

Owners

SourceSource
CompanyInterestOwnership
Epangelo Mining Company (Pty) Ltd. 10 % Indirect
China General Nuclear 90 % Indirect
Swakop Uranium Ltd. (operator) 100 % Direct
Swakop Uranium (SU) represents a partnership between the Republic of Namibia, represented by Epangelo Mining Company (10%) and China General Nuclear of the People’s Republic of China (90%).

Contractors

Lock

- subscription is required.

Deposit type

  • Intrusion related

Summary:

The Husab Project is dominated by a series of north-northeast to northeast trending regionalscale antiforms and synforms, which make up the main structural architecture of the entire Central Zone of the Damara. These meta-sedimentary folds or dome-like structures of the DOB are cored by gneissic and metasedimentary rocks of the Abbabis Formation.

The Husab Uranium Project uranium mineralisation is associated with intrusive alaskite rocks and is informally referred to as a Rössing Type uranium occurrence.

At the Husab Uranium Project, mineralised alaskite occur proximal to the contact between the Khan Formation and calc-silicates of the Rössing Formation. The majority of the uraniferous alaskites are located within the Rössing Formation. The host Rössing Formation can vary from 50m to over 200m wide and mineralised intercepts can vary from a few metres to over 100m wide.

The average width of mineralised horizons is approximately 20m. The mineralisation at Zones 1 to 4 is a near-continuous mineralised area extending across approximately 8km strike length and up to 2km across strike. Individual mineralised units can be traced for several hundred metres along strike and down dip. Metallurgical indicates that uraninite is the main uranium mineral. Elevated uranium grades (for example) associated with beta-Uranophane, an oxidation product of uraninite, have been identified in drillhole RDD002.

In addition to primary alaskite hosted uranium mineralisation, the tenement holding hosts occurrences of secondary uranium vanadate (carnotite), similar to that comprising mineralisation at the Langer Heinrich development project. The best examples of secondary uranium mineralisation are found at the Husab Uranium Project, north of the Husab fluorite mine. A single line of drilling completed on this target zone has intersected calcrete hosted uranium mineralisation in a flat lying paleochannel.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits20242023202220212020201920182017
Uranium t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4,0113,5711,344
All production numbers are expressed as U3O8.

Operational metrics

Metrics202420232022202120202019201820172016
Daily mining capacity  ....  Subscribe
Daily processing capacity  ....  Subscribe
Annual mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual ore mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe65,318,830 t88,082,523 t78,204,373 t100,047,675 t
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Mine Financials

Units2024202320222021202020192018
Capital expenditures M NAD  ....  Subscribe  ....  Subscribe
After-tax Income M NAD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 337   -5,374  

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jul 29, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 29, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 29, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2024
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required ...... Subscription required ...... Subscription required 2019
...... Subscription required ...... Subscription required ...... Subscription required 2018
...... Subscription required ...... Subscription required ...... Subscription required 2017
...... Subscription required ...... Subscription required ...... Subscription required 2016

Aerial view:

Lock

- subscription is required.