Search Criteria
Asset Type        
Status
Search result: 3 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Egypt
............................ Subscription required
390,00034,600
CPF, CRF, URF
12
  • Annual processing capacity
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste OP
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 12,525
  • 125,000
  • 137,497
  • 12,114
  • -
  • -
  • 13,130
  • -
  • 111,297
  • 11,916
  • 12,500
  • -
  • 16,281
  • -
  • 80,789
  • 11,913
  • 12,500
  • -
  • 15,459
  • -
  • 79,675
  • 12,859
  • 12,500
  • 2.37
  • 24,373
  • -
  • 79,214
  • 12,568
  • -
  • -
  • -
  • -
  • -
  • -
Egypt
............................ Subscription required
390,000
12
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • -
  • -
  • -
  • -
  • 12.38
  • 11,696
  • 125,000
  • 136,420
  • 7.9
  • 12,391
  • 97,800
  • 110,222
  • 4.1
  • 15,656
  • 64,100
  • 79,774
  • 4.5
  • 14,372
  • 64,018
  • 78,391
  • 2.37
  • 23,131
  • 54,746
  • 77,877
  • -
  • -
  • -
  • -
Egypt
............................ Subscription required
3,000
CPF, CRF, URF
8
  • Ore tonnes mined
  • -
  • 829
  • 739
  • 625
  • 1,087
  • 1,243
  • -
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill