Search Criteria
Asset Type        
Status
Search result: 7 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Heavy Mobile Equipment Key Personnel Phone Email
Asset Type Model Size Qty Job Title Name LinkedIn
AssetExisting Fleet TypeExisting ModelExisting SizeExisting QuantityJob TitleNameProfilePhoneEmail
Ecuador
............................ Subscription required
  • Backhoe^
  • Backhoe^
  • Crane^
  • Dozer (crawler)^
  • Dozer (crawler)^
  • Dozer (crawler)^
  • Dozer^
  • Drill (blasthole)^
  • Drill^
  • Forklift^
  • Grader^
  • Grader^
  • Grader^
  • Loader (FEL)^
  • Loader^
  • Shovel (hydraulic)^
  • Tire manipulator^
  • Truck (fuel / lube)^
  • Truck (haul)^
  • Truck (haul)^
  • Truck (haul)^
  • Truck (water)^
  • Truck^
  •  .................................  Subscription required
  • -
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  • -
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  • -
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  • 3.1 m3
  • 1.1 m3
  • 19 t
  • 4.9 m blade
  • 3.9 m blade
  • 3.3 m blade
  • 4.9 m blade
  • 349 mm
  • 100 mm
  • -
  • 7.3 m blade
  • 4.9 m blade
  • 4.3 m blade
  • 21 m3
  • 7 m3
  • 29 m3
  • -
  • -
  • 63.1 m3
  • 38 t
  • 220 t
  • 144 t
  • -
  • 3
  • 1
  • 1
  • 2
  • 3
  • 2
  • 3
  • 4
  • 4
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • 4
  • 1
  • 2
  • 19
  • 6
  • 30
  • 3
  • 1
  • Chief Operating Officer
  • Consultant - Costs
  • Consultant - Infrastructure
  • Consultant - Mining & Costs
  • Consultant - Recovery Methods & Costs
  • General Manager
  • Project Manager
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
 ............  Subscription required
Ecuador
............................ Subscription required
  • ANFO Loader^
  • ANFO Loader^
  • Cable bolter^
  • Compactor^
  • Deck & Boom Trucks
  • Drill (long hole)^
  • Drill jumbo (two boom)^
  • Drill^
  • Grader^
  • Load-Haul-Dump (LHD)^
  • Load-Haul-Dump (LHD)^
  • Personnel Carrier^
  • Personnel Carrier^
  • Rock bolter^
  • Rockbreaker^
  • Scaler^
  • Scissor Lift^
  • Shotcreter^
  • Telescopic Handler^
  • Trans Mixer^
  • Truck (boom)^
  • Truck (fuel / lube)^
  • Truck (service)^
  • Truck (underground)^
  • Truck (water)^
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  • -
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 8.6 m3
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 51 t
  • -
  • 2
  • 2
  • 2
  • 1
  • 2
  • 3
  • 3
  • 1
  • 2
  • 2
  • 22
  • 2
  • 3
  • 3
  • 9
  • 2
  • 4
  • 2
  • 2
  • 6
  • 2
  • 2
  • 3
  • 4
  • 2
  • Chief Executive Officer
  • Consultant - Infrastructure
  • Consultant - Mining & Costs
  • Consultant - Recovery Methods & Costs
  • Project Manager
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  • -
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
 ............  Subscription required
Ecuador
............................ Subscription required
  • Bulldozer^
  • Drill^
  • Excavator^
  • Grader^
  • Loader (FEL)^
  • Personnel Carrier^
  • Truck (fuel / lube)^
  • Truck (haul)^
  • Truck (service)^
  • Truck (water)^
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 9 m3
  • -
  • 3.3 m3
  • 2.58 m
  • 3.9 m3
  • -
  • -
  • 45 t
  • -
  • 16000 l
  • 2
  • 5
  • 5
  • 2
  • 2
  • 5
  • 1
  • 22
  • 1
  • 2
  • Consultant - Infrastructure
  • Consultant - Mining & Costs
  • Country Manager
  • General Manager
  • VP, Projects
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
 ............  Subscription required
Ecuador
............................ Subscription required
  • Bolter
  • Cable bolter
  • Drill
  • Drill (long hole)
  • Drill (long hole)
  • Load-Haul-Dump (LHD)
  • Load-Haul-Dump (LHD)
  • Load-Haul-Dump (LHD)
  • Raise boring rig
  • Truck (underground)
  • Truck (underground)
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  • -
  • -
  • -
  • -
  • -
  • 10 cu. yd
  • 12 cu. yd
  • 6.3 cu. yd
  • -
  • 45 t
  • 32 t
  • 5
  • 2
  • 5
  • 3
  • 1
  • 5
  • 2
  • 3
  • 1
  • 10
  • 2
  • Chief Operating Officer
  • General Manager
  • Health & Safety Manager
  • Metallurgical Manager
  • Mine Manager
  • Plant Maintenance Superintendent
  • Plant Operations Manager
  • Sr. Health, Safety & Security Manager
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
 ............  Subscription required
Ecuador
............................ Subscription required
  • Cable bolter^
  • Drill jumbo (single boom)^
  • Drill jumbo (two boom)^
  • Grader^
  • Load-Haul-Dump (LHD)^
  • Load-Haul-Dump (LHD)^
  • Load-Haul-Dump (LHD)^
  • Rock bolter^
  • Scaler^
  • Shotcreter^
  • Truck (underground)^
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 10 t
  • 6.8 t
  • 3.5 t
  • -
  • -
  • -
  • 30 t
  • 1
  • 2
  • 2
  • 1
  • 2
  • 2
  • 1
  • 2
  • 1
  • 1
  • 3
  • President
  • Project Director
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  • Subscription required
  • Subscription required
 ............  Subscription required
Ecuador
............................ Subscription required
  • ANFO Loader^
  • Bolter^
  • Cable bolter^
  • Drill (long hole)^
  • Drill jumbo (two boom)^
  • Drill^
  • Forklift^
  • Grader^
  • Loader^
  • Load-Haul-Dump (LHD)^
  • Personnel Carrier^
  • Scissor Lift^
  • Shotcreter^
  • Telescopic Handler^
  • Truck (fuel / lube)^
  • Truck (underground)^
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  • -
  •  .................................  Subscription required
  • -
  • -
  • -
  •  .................................  Subscription required
  • -
  • -
  •  .................................  Subscription required
  •  .................................  Subscription required
  • -
  • -
  •  .................................  Subscription required
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 17 t
  • -
  • -
  • -
  • -
  • -
  • 40 t
  • 1
  • 2
  • 1
  • 5
  • 2
  • 2
  • 1
  • 1
  • 1
  • 7
  • 3
  • 1
  • 1
  • 1
  • 1
  • 5
  • Consultant - Infrastructure
  • Consultant - Mining & Costs
  • Consultant - Recovery Methods & Costs
  • Engineering Manager
  • Executive VP and Chief Operating Officer
  • General Manager Country Lead
  • Health, Safety & Environment Manager
  • President and CEO
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
 ............  Subscription required
  • Subscription required
Ecuador
............................ Subscription required
      • Environmental Manager
      • Mine Manager
      •  ..............................  Subscription required
      •  ..............................  Subscription required
      • Subscription required
      • Subscription required
       ............  Subscription required
      Key Personnel
      *** Multi - mine Operation
      *    Part of an Operation
      ^    Required Equipment
      Qty - Quantity
      EV - Electric
      AV - Autonomous
      Subscription required - Subscription is required.
      '-' - Data is unavailable.