Search Criteria
Asset Type        
Status
Search result: 9 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Mongolia
............................ Subscription required
6,000
12
  • Annual mining capacity
  • Annual processing capacity
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • -
  • 3,000
  • 1,200
  • 958
  • -
  • 1,525
  • 922
  • -
  • -
  • 923
  • -
  • 2,043
  • 834
  • -
  • 1,200
  • 1,138
  • -
  • 1,998
  • 699
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Mongolia
............................ Subscription required
12.5
  • Annual ore mining rate
  • Annual processing capacity
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 2,200
  • 2,200
Mongolia
............................ Subscription required
35,000
6.75
  • Daily processing capacity
  • Annual ore mining rate
  • Annual processing capacity
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 1.9
  • 650
  • 650
  • 10.9
Mongolia
............................ Subscription required
4
Mongolia
............................ Subscription required
150,000
30
  • Annual processing rate
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 30,000
  • 1.1
Mongolia
............................ Subscription required
48,000
6
  • Coal tonnes mined
  • Stripping / waste ratio
  • Waste
  • -
  • -
  • -
  • 690
  • 5.14
  • 9,693
  • 1,360
  • 4.36
  • 16,038
  • 1,490
  • 3.59
  • 14,418
  • 5,050
  • 3.61
  • 49,194
  • -
  • -
  • -
  • -
  • -
  • -
Mongolia
............................ Subscription required
270,000110,150
1,284
27
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • 84,983
  • 39,124
  • 97,694
  • 40,200
  • 101,316
  • 40,777
  • 91,310
  • 38,738
  • -
  • -
Mongolia
............................ Subscription required
15
  • Coal tonnes mined
  • 21
  • 16
  • 117
  • 82
  • 85
  • -
  • -
Mongolia
............................ Subscription required
1
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill