Search Criteria
Asset Type        
Status
Search result: 5 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Liberia
............................ Subscription required
70,000
14
  • Annual ore mining rate
  • Annual processing capacity
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 5,000
  • 5,000
  • 4.2
Liberia
............................ Subscription required
Liberia
............................ Subscription required
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 16.1
  • 1,352
  • 21,797
  • 23,149
  • 1,411
  • -
  • -
  • -
  • -
  • -
Liberia
............................ Subscription required
11
Liberia
............................ Subscription required
29
  • Ore tonnes mined
  • 3,900
  • 4,300
  • 4,600
  • 5,300
  • 4,300
  • 4,600
  • -
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill