Search Criteria
Asset Type        
Status
Search result: 2 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Heavy Mobile Equipment Key Personnel Phone Email
Asset Type Model Size Qty Job Title Name LinkedIn
AssetExisting Fleet TypeExisting ModelExisting SizeExisting QuantityJob TitleNameProfilePhoneEmail
Guatemala
............................ Subscription required
  • Dozer (crawler)^
  • Dozer (rubber tire)^
  • Drill (blasthole)^
  • Drill^
  • Excavator^
  • Excavator^
  • Forklift^
  • Grader^
  • Loader^
  • Telescopic Handler^
  • Truck (boom)^
  • Truck (fuel / lube)^
  • Truck (haul)^
  • Truck (service)^
  • Truck (water)^
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 460 HP
  • 354 HP
  • 10 inch
  • -
  • 15 m3
  • 49 t
  • 2.5 t
  • 14 ft
  • 11 m3
  • -
  • 28 t
  • -
  • 90 t
  • -
  • 15000 l
  • 3
  • 2
  • 2
  • 3
  • 2
  • 2
  • 1
  • 2
  • 2
  • 1
  • 1
  • 3
  • 15
  • 2
  • 4
  • Consultant - Infrastructure
  • Consultant - Mining & Costs
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  • Subscription required
  • Subscription required
 ............  Subscription required
Guatemala
............................ Subscription required
  • ANFO Loader
  • Cable bolter
  • Concrete sprayer
  • Deck & Boom Trucks
  • Drill (long hole)
  • Drill (long hole)
  • Drill jumbo (two boom)
  • Grader
  • Load-Haul-Dump (LHD)
  • Load-Haul-Dump (LHD)
  • Personnel Carrier
  • Rock bolter
  • Scaler
  • Scissor Lift
  • Trans Mixer
  • Truck (fuel / lube)
  • Truck (underground)
  • -
  •  .................................  Subscription required
  • -
  • -
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  •  .................................  Subscription required
  • -
  •  .................................  Subscription required
  • -
  • -
  • -
  • -
  •  .................................  Subscription required
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 8.3 m3
  • 6 m3
  • -
  • -
  • -
  • -
  • -
  • -
  • 45 t
  • 2
  • 3
  • 2
  • 3
  • 5
  • 3
  • 10
  • 1
  • 3
  • 6
  • 12
  • 7
  • 2
  • 3
  • 3
  • 2
  • 12
  • Drill Superintendent
  • Engineering Manager
  • Maintenance Planner
  • Operations Manager
  • Sr. Vice President Strategy
  • Supply Chain Manager
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  •  ..............................  Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
  • Subscription required
 ............  Subscription required
Key Personnel
*** Multi - mine Operation
*    Part of an Operation
^    Required Equipment
Qty - Quantity
EV - Electric
AV - Autonomous
Subscription required - Subscription is required.
'-' - Data is unavailable.