Search Criteria
Asset Type        
Status
Search result: 7 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
11,000
30
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • 4.6
Mozambique
............................ Subscription required
48
  • Annual milling capacity
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes milled
  • -
  • -
  • -
  • -
  • -
  • 2,000
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 2,000
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 2,351
  • 1,154
  • -
  • 1,834
  • 205
  • 2,039
  • 1,120
  • -
  • -
  • -
  • -
  • -
Mozambique
............................ Subscription required
6,000
27
  • Annual ore mining rate
  • Annual processing rate
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 480
  • 480
  • 2
Mozambique
............................ Subscription required
8
Mozambique
............................ Subscription required
165
  • Ore tonnes mined
  • -
  • 40,029
  • 39,283
  • 34,357
  • 36,804
  • 33,961
  • -
Mozambique
............................ Subscription required
50
  • Annual processing rate
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 500,000
  • 0.8
Mozambique
............................ Subscription required
20,000
6
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • 1,210^
  • 4.1
  • 1,207
  • 5,819
  • 7,026
  • 1,147
  • 6
  • 740
  • 4,969
  • 5,709
  • 1,002
  • 6.2
  • 230
  • 1,690
  • 1,919
  • 346
  • 4.9
  • 1,072
  • 6,080
  • 7,152
  • 846
  • 4.4
  • 748
  • 3,874
  • 4,622
  • 842
  • -
  • -
  • -
  • -
  • -
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill