Search Criteria
Asset Type        
Status
Search result: 17 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Zimbabwe
............................ Subscription required
15
Zimbabwe
............................ Subscription required
800
7
Zimbabwe
............................ Subscription required
> 2,4002,200
1,204
3
  • Daily ore mining rate
  • Daily milling capacity
  • Ore tonnes mined
  • Tonnes milled
  • -
  • -
  • -
  • 779^
  • -
  • 3.8
  • 741
  • 752
  • 1.2
  • 3.8
  • 669
  • 666
  • 1.2
  • 3.8
  • 571
  • 598
  • 1.2
  • 3.8
  • 556
  • 556
  • -
  • -
  • 545
  • 561
  • -
  • -
  • -
  • -
Zimbabwe
............................ Subscription required
3
Zimbabwe
............................ Subscription required
5
Zimbabwe
............................ Subscription required
3,000
4
  • Daily ore mining rate
  • Annual ore mining rate
  • Annual processing capacity
  • -
  • -
  • -
  • -
  • 2,500
  • 2,800
  • 3
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Zimbabwe
............................ Subscription required
1,000
9
Zimbabwe
............................ Subscription required
500
10
Zimbabwe
............................ Subscription required
8,0008,000
Yes
20
  • Annual milling capacity
  • Tonnes milled
  • -
  • 2,735
  • -
  • 2,816
  • 2,800
  • 2,861
  • -
  • 2,701
  • -
  • 2,814
  • -
  • 2,802
  • -
  • -
Zimbabwe
............................ Subscription required
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • 1,019
  • -
Zimbabwe
............................ Subscription required
900
14
Zimbabwe
............................ Subscription required
16
Zimbabwe
............................ Subscription required
10
Zimbabwe
............................ Subscription required
480
14
Zimbabwe
............................ Subscription required
1,300
Yes
6
  • Annual milling capacity
  • Ore tonnes mined
  • Tonnes milled
  • -
  • 419
  • 418
  • 900
  • 463
  • 461
  • -
  • 413
  • 412
  • -
  • 436
  • 434
  • -
  • 444
  • 444
  • -
  • 379
  • 390
  • -
  • -
  • -
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill