Search Criteria
Asset Type        
Status
Search result: 14 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Botswana
............................ Subscription required
10
Botswana
............................ Subscription required
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • 666
  • 332
  • 3,854
  • 1,270
  • -
  • -
  • -
  • -
  • -
  • -
Botswana
............................ Subscription required
Botswana
............................ Subscription required
360,00037,500
12
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • 78,500
  • 126,000
  • 13,300
  • 85,800
  • 107,000
  • 12,100
  • 64,700
  • 81,500
  • 0.01
  • 65,600
  • 84,300
  • 10,400
  • -
  • -
  • -
  • -
  • -
  • -
Botswana
............................ Subscription required
3,000
11
  • Annual ore mining rate
  • Annual processing capacity
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 226
  • 200
  • 5
Botswana
............................ Subscription required
17,0007,600
2
  • Annual processing capacity
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • 2,100^
  • 2,500^
  • -
  • 2,750^
  • 2,700
  • 3,300
  • 1,500
  • 4,800
  • 2,770
  • 2,700
  • 3,700
  • 2,600
  • 6,300
  • 2,800
  • -
  • 3,000
  • 2,700
  • 5,700
  • 2,700
  • -
  • 3,300
  • 6,500
  • 9,800
  • 2,800
  • -
  • 3,100
  • 15,000
  • 18,100
  • 2,600
  • -
  • -
  • -
  • -
  • -
Botswana
............................ Subscription required
7,0007,400
767
15
  • Daily ore mining rate
  • Daily processing rate
  • Annual ore mining rate
  • Annual processing rate
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 7.2
  • 7.4
  • 2,600
  • 2,700
Botswana
............................ Subscription required
16
  • Annual mining capacity
  • Annual milling capacity
  • -
  • -
  • 4,500
  • 3,650
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Botswana
............................ Subscription required
22
Botswana
............................ Subscription required
19
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • 4,319
  • 3,456
  • 3,470
  • 2,844
  • -
  • -
  • -
  • -
  • -
  • -
Botswana
............................ Subscription required
10
  • Plant annual capacity
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 5,200
  • 6.2
Botswana
............................ Subscription required
11
  • Annual processing capacity
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste
  • Tonnes processed
  • 3,200
  • 29
  • -
  • -
  • 200
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Botswana
............................ Subscription required
1,950
  • Tonnes milled
  • -
  • -
  • 682
  • 663
  • 733
  • 831
  • -
Botswana
............................ Subscription required
71,00035,500
19
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • 2,800
  • 18,200
  • 13,300
  • 3,500
  • 24,900
  • 12,400
  • 4,900
  • 27,400
  • 13,600
  • 9,100
  • 46,300
  • 14,900
  • -
  • -
  • -
  • -
  • -
  • -
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill