Search Criteria
Asset Type        
Status
Search result: 4 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Dominican Republic
............................ Subscription required
7,0005,000
3.3
  • Daily ore mining rate
  • Daily processing rate
  • Annual ore mining rate
  • Annual processing capacity
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 5
  • 5
  • 1,800
  • 1,825
  • 0.4
Dominican Republic
............................ Subscription required
13
  • Annual processing capacity
  • -
  • -
  • -
  • -
  • -
  • 1.3
  • -
120,000
17
  • Daily processing rate
  • Daily processing capacity
  • Annual processing capacity
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 26
  • 24
  • 8,600
  • 1.9
  • 11,367
  • 21,557
  • 32,923
  • 9,448
  • 25
  • -
  • -
  • 2.1
  • 13,282
  • 27,863
  • 41,145
  • 9,110
  • 24
  • -
  • -
  • 2.3
  • 10,245
  • 23,525
  • 33,770
  • 8,828
  • 24
  • -
  • -
  • 2.06
  • 13,475
  • 27,745
  • 41,220
  • 8,607
  • -
  • -
  • -
  • 1.55
  • 15,697
  • 24,408
  • 40,105
  • 8,347
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Dominican Republic
............................ Subscription required
3,0002,702
CPF, URF
8
  • Daily ore mining rate
  • Daily milling rate
  • Daily milling capacity
  • Annual ore mining rate
  • Annual milling capacity
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 2.8
  • 2.7
  • 2.8
  • 1,008
  • 1,022
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill