Mine TypeOpen Pit
StagePreliminary Economic Assessment
Commodities
  • Manganese
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotIn August 2023, an updated Manganese Concentrate Scoping Study was completed, with results confirming Oakover as a long-life, tier-one manganese operation.

Key workstreams at Oakover over the next 12 months remain focused on the completion of environmental studies and surveys as the Firebird Metals Limited (the Company) works its way to EPA referral for the project.

In December, 2024, Firebird Metals signed an important agreement with the Karlka Nyiyaparli Aboriginal Corporation (KNAC) for Mining Lease 52/1086 at the Oakover Manganese Project. Agreement with the KNAC covers key areas related to future development work and commencement of operations at Oakover.

Owners

SourceSource
CompanyInterestOwnership
Firebird Metals Ltd. 100 % Direct
The Oakover Manganese Project is 100% owned by Firebird Metals Ltd.

Deposit type

  • Laterite

Summary:

Oakover is situated in the Collier Basin near the edge of the Pilbara Craton. A major portion of the tenement is covered by Quaternary cover with some calcrete along drainages. Several outcrops of the Middle Proterozoic Bangemall Group (Manganese subgroup), including various sediments of the Balfour Formation, Jigalong Formation and the Stag Arrow Formation are found on E52/3577 (Rohde, 2010).

The manganese mineralisation occurs as multiple seams or bands of varying thickness within a highly weathered shale (Balfour Formation). The mineralisation was generally found to be shallow (mostly within 20 m of the surface), gently dipping and laterally extensive across the target area. The lateritic profile and subsequent manganese mineralisation show the zonation within the regolith and distribution of manganese mineralisation. The higher-grade (or nearer-surface supergene/lateritic) manganese material is generally located within the upper portion of the regolith profile at shallow depths (0–15 m).

Basal lithologies at the project are manganiferous shale of the Balfour Formation, with total grades ranging from 5-10% Mn. Mineralisation is hosted with lenticular layers of ferruginous/manganiferours shale, within host silty / cherty shale.

The higher grade semi-massive manganese domain is a sub-horizontal shale horizon that has been preferentially enriched with manganese oxides and is ~15 m thick. This domain sits beneath a thin veneer of waste shale (silty/cherty shale) that is generally unmineralized and ranges from 0-10 m thick. Grades of the semi-massive domain vary from 10-15% Mn. A surficial duricrust of supergene enriched lateritic manganese occurs discontinuously over the top of Sixty-Sixer and Karen deposits but is notably absent at Jay-Eye. This final mineralised domain is up to 15 m thick (though averages 2-5 m) and has grades that very widely up to 28% Mn.

Dimensions
The combined Sixty-sixer and Jay-Eye deposits have been drilled over a strike length of 4,000 m in a northeastsouthwest direction.

Drilling at Sixty-sixer extends approximately 900 m across strike, and 600 m at Jay-eye. Drilling at Karen extends approximately 1,000 m along strike (northeast-southwest) and approximately 800 m across strike.

Mineralisation at all deposits extends to depths of approximately 50 m and varies in thickness from section to section, averaging 15-20 m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. AnnualLOM
Manganese kt 1,20022,300
All production numbers are expressed as concentrate.

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityAverage
All-in sustaining costs (AISC) Manganese  ....  Subscribe
C1 cash costs Manganese  ....  Subscribe
Assumed price Manganese  ....  Subscribe
* According to 2023 study / presentation.

Operating Costs

CurrencyAverage
OP mining costs ($/t milled) AUD  ....  Subscribe
Processing costs ($/t milled) AUD  ....  Subscribe
G&A ($/t milled) AUD  ....  Subscribe
Total operating costs ($/t milled) AUD  ....  Subscribe
* According to 2023 study.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Sustaining CapEx $M AUD  ......  Subscribe
Pre-tax NPV @ 8% $M AUD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 9, 2024

Aerial view:

Lock

- subscription is required.