Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Bauxite
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotGove site has been supplying the global aluminium industry with world-class bauxite for more than 40 years.

The implementation of the Safe Production System delivered record annual production at Gove in 2024.

Bauxite mining operations at Gove are expected to end later this decade and work is already underway to support the closure of the operation and rehabilitation of the refinery, mine site and tailings facilities. In 2024, the halfway mark for the demolition works at the Gove alumina refinery, Australia’s largest demolition project, was reached.

In 2024, construction of a 10 MW solar PV facility at Gove operations commenced to secure a more sustainable power supply for the region beyond mining.

Owners

SourceSource
CompanyInterestOwnership
Rio Tinto plc 100 % Indirect
Rio Tinto Alumina Gove Pty Ltd. (operator) 100 % Direct
Rio Tinto Plc owns and operates the Gove mine through its wholly-owned subsidiary, Rio Tinto Alumina Gove Pty Ltd (RTA Gove Pty Ltd).

Contractors

Lock

- subscription is required.

Deposit type

  • Bauxite
  • Laterite

Summary:

Bauxite deposits at Gove occur at a latitude slightly more than 12 degrees south of the equator. The bauxite appears to be a weathering product of Cretaceous marine sediments, which overlie Proterozoic basement rocks of the Arnhem Inlier. Uplift, weathering, and erosion of the sediments, as well as formation of the bauxite, took place during the Tertiary, but exact timing and detail of events remains uncertain. Marine reworking of weathered products is likely to have taken place, possibly more than once.

Pisolitic textures are dominant, with variable cementation. However, variably cemented coarser nodule horizons are also common. Some deeper bauxite, as well as underlying laterite, contain abundant interconnected solution cavities, which may have been created geochemically and/or biologically (associated with root channels). Modern day root channel structures and infill, in the upper part of the bauxite, are common. Gibbsite is the major ore mineral, with boehmite being of lesser significance.

Bauxite occurs on top of a gently undulating plateau at approximately 30 to 70m above sea level, over an area measuring approximately 20km east-west by 15km north-south as seen in the figure below. The plateau has been variably dissected by erosion into three main plateau areas. Main Plateau is the largest contiguous bauxite area, whilst Rocky Bay and Eldo are two adjacent smaller bauxite areas, figure below. The present day extent of the bauxite likely represents a fraction of what was originally present.

The bauxite horizon has historically been up to 10m thick but is more typically 2 m to 4 m in thickness. It comprises several distinct layers in either a dominantly cemented (“hard”) profile, or a dominantly poorly cemented to uncemented (loose or soft) profile. The latter tends to be thicker and occupies hollows in the plateau surface and is often considered to be a proximal erosion/deposition product of the “hard” profile bauxite.

Hard profile bauxite generally consists of footwall vuggy laterite (Lat), overlain by nodular bauxite (Lower Nodules – Nod), overlain by extremely vuggy “tubular” bauxite (Tub), overlain by strongly cemented pisolitic bauxite (Cemented Hard - CH), overlain by weakly cemented pisolitic bauxite (Cemented Soft - CS), overlain by a thin loose pisolite layer (LP), overlain by a thin overburden layer (OB) being a mix of loose pisolites and topsoil, figure on next page.

All of the lithologies described above are generally elevated in bauxitic alumina throughout the deposit plateau. The extent of the mineralisation described therefore depends on the chemical grade threshold and thickness limits applied.

The Gove deposits extend over an area approximately 20 km east-west by 15 km north-south that includes three separate lateritic bauxite plateaus (Main Plateau, Rocky Bay and Eldo). The bauxite horizon averages 3.5 m in thickness but can be up to 10 m thick and is typically 0.6 m (up to 8.5 m) below surface cover.

The Gove deposits extend over an area approximately 20 km east-west by 15 km north-south that includes three separate lateritic bauxite plateaus (Main Plateau, Rocky Bay and Eldo). The bauxite horizon averages 3.5 m in thickness but can be up to 10 m thick and is typically 0.6 m (up to 8.5 m) below surface cover.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Summary:

There is no beneficiation plant at Gove Operations.

Crushing plant only to reduce oversize material – no screening required.

Bauxite at Gove is direct shipping ore (DSO).

Commodity Production

CommodityUnits2024202320222021202020192018201720162015
Bauxite kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe12,20112,54011,2019,0917,497
All production numbers are expressed as ore.

Operational metrics

Metrics2024202320222021
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 14, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 14, 2025

Workforce

EmployeesYear