Arctos Anthracite Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusInactive / Suspended
Commodities
  • Coal (PCI)
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotThe Arctos Anthracite Project is a proposed coal mining development in northwestern British Columbia. It involves the extraction of anthracite, a high-grade form of coal used in steelmaking.

The project has faced significant opposition from the Tahltan First Nation due to its location in an area of cultural and ecological importance. This has caused delays and necessitated negotiations with the BC government.

Project's sale to BC Rail in 2015 included a 10-year repurchase option, meant to address opposition from the Tahltan First Nation and other stakeholders. Since 2015, there has been little development on the project as it remains a subject of environmental and cultural assessment.

Further updates may require a revisit of government and community negotiations or renewed mining interest before the license repurchase deadline in 2025.

Owners

SourceSource
CompanyInterestOwnership
Fortune Minerals Limited Indirect
POSCO International Corp. Indirect
In May 2015, the Arctos Anthracite Joint Venture (Fortune Minerals and POSCO) announced it had sold its interests in the Arctos coal licenses to BC Rail but the partners maintain the exclusive right to repurchase the licenses for a 10 year period.

Deposit type

  • Sedimentary

Summary:

The anthracite deposits at the Property are part of significant coal measures within the Bowser Basin. This ancient basin formed and filled with sediments eroded from surrounding high land during the late Jurassic to early Cretaceous periods.

The Klappan (Anthracite) Formation sediments are interpreted to have been deposited in a regional, shallow gradient, stable coastal delta (Gulf 1988). The environments of deposition cycled between fluviodeltaic and marine. The coal seam deposition is an extreme of the cycles, with an average of 20 to 30 metres of mudstone, siltstone and sandstone separating the coal seams. The interburden lithology generally consists of laminated mudstone, siltstone and fine-grained sandstone. Occasional deposition of coarse sandstone and conglomerate occurs.

Anthracite seams are encountered on the Arctos Anthracite Property. Anthracite is the highestrank coal under international coal classification standards. Anthracite on the Property occurs in 33 identified seams with individual seam true thickness of up to 11 metres; 28 of the seams have an average true thickness of at least 0.50 metres and contain at least 50 percent coal.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnitsLOM
Coal (PCI) kt 69,242
All production numbers are expressed as clean coal.

Production Costs

CommodityUnitsAverage
Cash costs Coal (PCI) CAD 127.61 / t *  CAD
Total cash costs Coal (PCI) CAD 147.36 / t *  CAD
Assumed price Coal (PCI) CAD 184 / t *  CAD
* According to 2012 study / presentation.

Operating Costs

CurrencyAverage
OP mining costs ($/t mined) CAD  ....  Subscribe
Processing costs ($/t processed) CAD  ....  Subscribe
Total operating costs ($/t processed) CAD  ....  Subscribe
* According to 2012 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M CAD  ......  Subscribe
Sustaining CapEx $M CAD  ......  Subscribe
Total CapEx $M CAD  ......  Subscribe
Total OpEx $M CAD  ......  Subscribe
Income Taxes $M CAD  ......  Subscribe
Royalty payments $M CAD  ......  Subscribe
Gross revenue (LOM) $M CAD  ......  Subscribe
EBITDA (LOM) $M CAD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M CAD  ......  Subscribe
After-tax Cash Flow (LOM) $M CAD  ......  Subscribe
Pre-tax NPV @ 8% $M CAD  ......  Subscribe
After-tax NPV @ 8% $M CAD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 29, 2024
....................... Subscription required ....................... Subscription required Subscription required Nov 26, 2024

Aerial view:

Lock

- subscription is required.