Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ...  |
Mine Life | 8 years (as of Jan 1, 2022) |
New South Wales Energy Coal (NSWEC) comprises the Mt Arthur Coal open-cut energy coal mine in the Hunter Valley.
June 16, 2022, BHP announced that it will retain New South Wales Energy Coal (NSWEC) in its portfolio, seek the relevant approvals to continue mining beyond its current mining consent that expires in 2026 and proceed with a managed process to cease mining at the asset by the end of the 2030 financial year. |
Source:
p. 181,202
Company | Interest | Ownership | Investor's Info |
BHP Group Ltd.
|
100 %
|
Indirect
|
|
Hunter Valley Energy Coal Pty Ltd.
(operator)
|
100 %
|
Direct
|
|
BHP ownership: 100 per cent. BHP owns the Mt Arthur thermal coal mine in New South Wales through Hunter Valley Energy Coal. Operator: Hunter Valley Energy Coal Pty Ltd.
Contractors
- Subscription is required.
Summary:
Produces a medium rank bituminous thermal coal.
Summary:
During FY22, mining occurred in the Windmill, Calool, Roxburgh, Ayredale and Saddlers pits. Mining has occurred at a lesser intensity than the maximum rate of extraction approved by the Project Approval. Overburden was placed on the conveyor corridor, CD areas, VD areas, Saddlers North and Belmont.
Thiess, a subsidiary of the CIMIC Group, operates under a total services contract to mine the Ayredale and Roxburgh pits, located in the southern areas of the Mt Arthur Coal mine. Overburden and interburden material was removed by excavator/shovel and transported via rear dump truck to overburden emplacements, including visual dumps 4 to 5 (VD4 to VD5), contingency dumps 1 to 5 (CD1 to CD5), Out Of Pit Dump North (OP1N), conveyor corridor dump (CC1) and Saddlers dump. Raw coal was extracted by excavator and transported to the CHPP by rear dump truck.
During three-year term, approximately 65 million tonnes of ROM coal is planned to be mined using truck and shovel and/or excavator methods for an equivalent 47.4 million tonnes of product coal. This method is consistent with current and previous site open cut operations. During this Annual Forward Program (AFP) period, mining is proposed to continue within the extended pit shell of Mt Arthur, consisting of:
• Windmill Pit;
• Calool Pit;
• Roxburgh Pit;
• Ayredale Pit; and
• Saddlers Pit.
Prior to excavation of a new open cut strip, pre-stripping operations ensure that natural resources such as vegetation and topsoil are cleared ........

Source:
Summary:

- subscription is required.
Production:
Commodity | Units | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 |
Coal (thermal)
|
Mt
| ...... ^ | ......  | ......  | ......  | ......  | 19 | 18 |
All production numbers are expressed as clean coal.
^ Guidance / Forecast.
- Subscription is required.
Operational Metrics:
Metrics | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 |
Coal tonnes mined
| ......  | ......  | ......  | 24,969,000 t of ROM coal | 23,679,000 t of ROM coal | 23,511,000 t of ROM coal |
Reject
| ......  | ......  | ......  | 4,599,000 t | 3,116,000 t | 3,069,000 t |
Plant annual capacity
| ......  | ......  | ......  | 23 Mt | 23 Mt | 23 Mt |
^ Guidance / Forecast.
- Subscription is required.
Reserves at June 30, 2022:
Cut-off criteria:
Coal Resources: 0.3m seam thickness and 35% raw ash.
Coal Reserves: 0.3m seam thickness, 32%ash, 40% coal plant yield.
Category | Tonnage | Commodity | Marketable Coal |
Proven
|
95 Mt
|
Coal (thermal)
|
69 Mt
|
Probable
|
49 Mt
|
Coal (thermal)
|
36 Mt
|
Proven & Probable
|
144 Mt
|
Coal (thermal)
|
104 Mt
|
Measured
|
104 Mt
|
Coal (thermal)
|
|
Indicated
|
51 Mt
|
Coal (thermal)
|
|
Inferred
|
8.6 Mt
|
Coal (thermal)
|
|
Total Resource
|
164 Mt
|
Coal (thermal)
|
|
Type | Material | Diameter | Length | Description |
Mine Management:
Job Title | Name | Phone | Profile | Ref. Date |
.......................
|
.......................
|
|
|
Sep 27, 2022
|
.......................
|
.......................
|
.......................
|
|
Dec 12, 2022
|
.......................
|
.......................
|
.......................
|
|
Sep 27, 2022
|
.......................
|
.......................
|
|
|
Sep 27, 2022
|
.......................
|
.......................
|
|
|
Sep 27, 2022
|
.......................
|
.......................
|
|
|
Sep 27, 2022
|
.......................
|
.......................
|
|
|
Sep 27, 2022
|
.......................
|
.......................
|
|
|
Sep 27, 2022
|
.......................
|
.......................
|
|
|
Nov 1, 2022
|
.......................
|
.......................
|
|
|
Sep 27, 2022
|
.......................
|
.......................
|
|
|
Sep 27, 2022
|
.......................
|
.......................
|
|
|
Sep 27, 2022
|
- Subscription is required.
Staff:
Employees | Contractors | Total Workforce | Year |
|
|
|
2021
|
|
|
|
2020
|
|
|
|
2019
|
|
|
|
2018
|
Corporate Filings & Presentations:
- Subscription is required.
- Subscription is required.