Location: 1.7 km NW from Rosewood, Queensland, Australia
Stay on top of the latest gold discoveries. Examine the latest updates on drilling outcomes spanning various commodities.
Mining scale, mining and mill throughput capaciites.Full profiles of select mines and projects.
Shaft depth, mining scale, backfill type and mill throughput data.Full profiles of select mines and projects.
Equipment type, model, size and quantity.Full profiles of select mines and projects.
Camp size, mine location and contacts.Full profiles of select mines and projects.
The rehabilitation area consisted of approximately 100 ha with a significant fall of approximately 100 m (average ˜10% slope) from the top of the catchment to the discharge point. During bulk earthworks, final profiling and the early stages of revegetation a number of erosion and sediment controls were implemented with a sediment basin required prior to the discharge point to capture sediment mobilised from the rehabilitation area and prevent noncompliant discharges. Using a traditional approach to sediment basin sizing, a basin volume of approximately 80 ML would have been required, which due to its size, would need to be a permanent feature of the final landform.A HES basin was considered as an alternative to a traditional sediment settling basin and modelling found that it offered a much smaller volumetric requirement, with an improved proportion of stormwater treated and allowed a flowthrough approach rather than batch capture and treatment of stormwater.