Overview
Stage | Production |
Mine Type | Underground |
Commodities |
|
Mining Method |
|
Production Start | ...  |
The operation includes the Hampton-Boulder-Jubilee (HBJ) underground mine that is situated adjacent to the 1.2Mtpa Carbon-in-Leach (CIL) Jubilee Plant. |
Source:
p. 150
Contractors
- Subscription is required.
Deposit Type
- Paleoplacer
- Orogenic
- Porphyry
Summary:
South Kalgoorlie
The SKO is located within the Eastern Goldfields Superterrane and the 842sqkm tenement package traverses across the Coolgardie, Ora Banda, Kambalda and Boorara Domains. Mineralisation is associated with the greenstone sequence that consists of a mafic to ultramafic volcanic succession that is overlain by an intermediate to felsic volcano-sedimentary sequence.
The structural architecture is dominated by NNW-trending crustal scale shear zones including the Boulder-Lefroy, Zuleika, Abattoir, Boorara, Kunanulling, Binduli and Spargoville structural corridors. These structural corridors are the key influencers of mineralisation in the greater Kalgoorlie district and to date have yielded a mineral endowment of over 100Moz.
Mineralisation styles within the district is a combination of Orogenic and Paleoplacer style deposits. Mineralisation is controlled by Brittle-Ductile shear zones, 1st and 2nd order structures that act as Lithostratigraphic contacts (as fluid conduits) through late stage brittle structures. Mineralisation is also associated with fertile sulphidised intrusive porphyries and layered mafic intrusions with chemically reactive lithologies that provide a rheological contrast.
Stratigraphy for the Ora Banda and Kalgoorlie Domains is relatively well-known and comprises (from stratigraphically lowest) a lower basalt unit, komatiitic to high-magnesian basaltic rocks, an upper basalt unit and overlying felsic volcanic-sedimentary units. Conglomeratic a ........

Summary:
HBJ Underground
The HBJ gold deposit is mined by a top down long hole open stoping (LHOS) method. This mining method was selected to minimise the impact of mining induced stress on the underground operations through the use of geotechnical driven mining sequences at the same time as increasing the extraction rates.
The orebody is accessed through the hanging wall by a central access from which north and south drives are developed.
An initial porphyry ore lode is encountered and developed. Further out in the footwall there is an ore unit sitting against an ultra-mafic contact. Development of the 2401 (ultra-mafic) lodes are delayed as late as possible but just in time for stoping extraction. The priority is placed on developing the western lode followed by a step over to the eastern lode for both the northern and southern extents. Once the stoping panels are mined back towards the main access, development from the access to the north and south can be completed thus completing development.
The stoping front retreats from both northern and southern extents towards the access following a top down LHOS method leaving rib pillars. Additional sill pillars are also planned on the eastern lodes where the ultra-mafic contact is present to ensure the safe extraction of the ore whilst minimizing the potential for footwall failure. The dimensions of the stopes vary depending on what lode they are extracting. On the western lodes, the stopes generally between 25 and 35m long and 17m h ........

Source:

- subscription is required.
Flow Sheet:
Summary:

- subscription is required.
Production:
Commodity | Units | 2017 | 2016 | 2015 |
Gold
|
oz
| 78,912 | 45,403 | 19,496 |
All production numbers are expressed as metal in doré.
Operational Metrics:
Metrics | 2022 | 2021 | 2019 | 2018 | 2017 |
Annual processing capacity
| ......  | ......  | 1.2 Mt | 1.2 Mt | 1.2 Mt |
Ore tonnes mined
| ......  | ......  | | | 829,076 t |
Tonnes processed
| ......  | ......  | | | 987,666 t |
- Subscription is required.
Reserves at March 31, 2022:
The mineral resource estimate has been reported at a 1.36 g/t cut off within a 3.0 m minimum mining width (no dilution) MSOs using a $AU2,250/oz gold price.
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven
|
919 kt
|
Gold
|
3.3 g/t
|
98 koz
|
Probable
|
2,717 kt
|
Gold
|
4.1 g/t
|
359 koz
|
Proven & Probable
|
3,636 kt
|
Gold
|
3.9 g/t
|
457 koz
|
Measured
|
2,799 kt
|
Gold
|
2.9 g/t
|
262 koz
|
Indicated
|
12,136 kt
|
Gold
|
3 g/t
|
1,183 koz
|
Inferred
|
10,116 kt
|
Gold
|
3.3 g/t
|
1,058 koz
|
Total Resource
|
25,051 kt
|
Gold
|
3.1 g/t
|
2,503 koz
|
Commodity Production Costs:
| Commodity | Units | 2017 | 2016 |
All-in sustaining costs (AISC)
|
Gold
|
AUD
|
1,100 / oz
|
1,301 / oz
|
C1 cash costs
|
Gold
|
AUD
|
953 / oz
|
1,149 / oz
|
All-in costs
|
Gold
|
AUD
|
1,267 / oz
|
1,842 / oz
|
Operating Costs:
| Units | 2017 |
Combined mining costs ($/t mined)
|
AUD
| 700 |
Processing costs ($/t milled)
|
AUD
| ......  |
- Subscription is required.
Financials:
| Units | 2017 | 2016 |
Capital expenditures
|
M AUD
|
20.9
|
29.1
|
Revenue
|
M AUD
|
130.1
|
72.4
|
Corporate Filings & Presentations: