Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Processing |
|
Mine Life | 5 years (as of Jan 1, 2021) |
Operational milestones during the year included substantial progress toward completion of the bulk stripping program at Koolan Island.
Complete the processing plant upgrade and the Main Pit waste stripping and footwall support programs to regain access to high grade ore. |
Latest News | Mount Gibson restart at Koolan Island makes the grade July 15, 2019 |
Source:
p. 11,18,23

Total Koolan Island Mineral Resources and Ore Reserves comprising the Main, Acacia East and Mangrove Deposits.
Main Mineral Resource is located on Mining Lease M04/417-I held by Koolan Iron Ore Pty Ltd, a 100% owned subsidiary of MGX.
Acacia East Mineral Resource is located on Mining Lease M04/416-I held by Koolan Iron Ore Pty Ltd, a 100% owned subsidiary of Mount Gibson Iron Ltd.
The Mangrove Mineral Resource is located on Mining Lease M04/417-I held by Koolan Iron Ore Pty Ltd, a 100% owned subsidiary of Mount Gibson Iron Ltd.
Summary:
Total Koolan Island Mineral Resources and Ore Reserves comprising the Main, Acacia East and Mangrove Deposits.
Koolan Island, Main Deposit
The mineralised zone is an overturned enriched haematitic sandstone horizon within the Yampi Sandstone Member unconformably overlying the Elgee Siltstone. It is between 12 and 30 metres thick, and dips 55 to 80 to the south.
The Main deposit mineralisation is approximately 2,000 m in length and is currently modelled to approximately 215 m in depth below mean sea level. Mineralisation continues and extends beyond this depth however further infill drilling is required to define this area with confidence. The resource is open at depth.
Koolan Island, Acacia East Deposit
The mineralised zone is an enriched haematitic sandstone horizon within the Yampi Sandstone member unconformably overlying the Elgee Siltstone. It is between 8 and 20 metres thick, and dips 45 to 60 to the south.
The Acacia East mineralisation is approximately 1,500m in length and is modelled to approximately 300 m in depth.
Koolan Island, Mangrove Deposit
The mineralised zone is an enriched haematitic sandstone horizon within the Yampi Sandstone Member unconformably overlying the Elgee Siltstone. It is between 12 and 30 metres thick. The mineralised unit is overturned and dips from 80 to the south in the west, twisting to right way up and 80 to the North in the east.
The Mangrove mineralisation is approximately 1,000m in length and is modelled to approximately 250 m in depth.
Summary:
Koolan Island, Main DepositThe deposit has been mined by conventional open pit mining methods, utilising industry standard practices of drilling, blasting, and load and haul using hydraulic backhoe excavators. The overburden waste has been removed by large size excavators with bulk mining method. Where required medium size excavators have been used for selective mining of ore. Known mining parameters from Main pit were used in the optimisation and pit design.
Modelling of mining dilution in three dimensions is by the digital application of a dilution skin around the ore in the Mineral Resource model. Metallurgical parameters are then added to the diluted model. The final diluted mining block model is used directly for pit optimisation and scheduling, without the further application of global factors.
Mine infrastructure is well established following 9 years of mining operations. The physical width and therefore depth of Main Pit is constrained by the final hanging wall pit limit relative to the position of the seawall.
Source:
Summary:
Ore from the Main deposit is crushed and screened at the existing Koolan Island process plant.
An upgrade of the ore crushing plant is being undertaken to ensure it can safely and cost-effectively handle the substantial increase in ore production expected over the remaining mine life.
The project is being undertaken via two stages:
1. Reconfiguration of lump and fines conveyors and stacker systems.
2. Construction of a new ROM wall, installation of new jaw and cone crushers, and upgrade of screening capacity.
Work staged to minimise disruption to crushing and ship-loading.
Stage 1 already completed with Stage 2 currently targeted for completion in the December 2021 quarter.
Recoveries & Grades:
Commodity | Parameter | 2021 | 2020 |
Iron (hematite)
|
Head Grade, %
| ......  | ......  |
Reserves at June 30, 2021:
Mineral Reserves and Resources are reported at a cut-off grade of 50% Fe.
Category | Tonnage | Commodity | Grade |
Probable
|
17.5 Mt
|
Iron
|
65.3 %
|
Measured
|
2.9 Mt
|
Iron
|
60.2 %
|
Indicated
|
32.5 Mt
|
Iron
|
64.2 %
|
Inferred
|
9.9 Mt
|
Iron
|
60.5 %
|
Total Resource
|
46.2 Mt
|
Iron
|
63.7 %
|