Yilgarn Hub Operation

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Yilgarn Hub is located in Western Australia’s Goldfields region and incorporates the Koolyanobbing, Parker Range and Carina mines.

In Q4 FY2024, MinRes made the difficult decision to cease exports from our Yilgarn operations at the end of the 2024 calendar year.

This decision has been influenced by a combination of factors, including the limited remaining mine life across operating mines spread over 220 kilometres, and the significant capital cost and lead time required to develop new resources to ensure continuity of supply.

Mining operations in the region will transition into care and
maintenance from early 2025, while will continue to undertake
exploration drilling and environmental studies.
Related Asset

Owners

SourceSource
CompanyInterestOwnership
Mineral Resources Ltd. 100 % Indirect
Yilgarn Iron Pty Ltd. (operator) 100 % Direct
Yilgarn Iron Pty Ltd (YIPL), a wholly owned subsidiary of MinRes, owns and operates the Yilgarn Operations.

Deposit type

  • Banded iron formation hosted

Summary:

Koolyanobbing is a collective term for the ore deposits at Koolyanobbing, Mount Jackson and Windarling. There are approximately 70 miles separating the three mining areas. Banded iron formations host the mineralization, which is predominately hematite and goethite. Each deposit is characterized with different chemical and physical attributes and, in order to achieve customer product quality, ore in varying quantities from each deposit must be blended together.

The mineralization at the Koolyanobbing operations is predominantly hematite and goethite replacements in greenstone-hosted banded iron formations. Individual deposits tend to be small with complex ore-waste contact relationships. The reserves at the Koolyanobbing operations are derived from 10 separate mineral deposits distributed over a 70 mile operating radius.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

The Yilgarn Hub operations will safely ramp down in a staged approach over the next six months, with up to 4.0M wmt expected to be shipped by the end of the calendar year 2024.
CommodityUnits202420232022202120202019201720162015
Iron Ore Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe3.2 10 12 12 
All production numbers are expressed as lump & fines. ^ Guidance / Forecast.

Operational metrics

Metrics20242023202220212016
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe11 Mt of lump & fines

Production Costs

Commodity2023202220212017
Cash costs Iron Ore  ....  Subscribe  ....  Subscribe  ....  Subscribe
Cash costs (sold) Iron Ore 40.2 / t  USD
Total cash costs (sold) Iron Ore 41.6 / t  USD
^ Guidance / Forecast.

Financials

Units2024202320222017
Revenue M  ....  Subscribe  ....  Subscribe  ....  Subscribe 464.2  USD
Sales margin M 36.3  USD
EBITDA M  ....  Subscribe  ....  Subscribe  ....  Subscribe 40.7  USD

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 25, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 25, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 25, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Oct 25, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 25, 2024

Total WorkforceYear
...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2017
...... Subscription required 2016
...... Subscription required 2015

Aerial view:

Lock

- subscription is required.