McLaren Project

Click for more information

Categories

Summary

Mine TypeOpen Pit
Study CompletedPrefeasibility
Commodities
  • Heavy Minerals
  • Ilmenite
  • Rutile
  • Leucoxene
  • Zircon
Mining Method
  • Dry mining
Mine Life... Lock
SnapshotThe 2025 Pre-Feasibility Study (PFS) confirms the McLaren deposit’s strong geological continuity and amenability to cost-effective extraction, supporting potential for attractive returns. While current data is high-level and insufficient for an Ore Reserve estimate, it justifies advancing the project. 

Key priorities for 2026 include additional resource drilling and optimizing mining parameters to validate robustness under various economic scenarios. 

The project is primarily Ilmenite-driven, with a non-magnetic co-product. Marketing began in late 2025, focusing on securing offtake agreements for sulfate ilmenite products. 

A core strength is the product quality: a combined TiO2 + FeO + Fe2O3 content of =96% significantly exceeds the industry standard (>90%) for titanium slag manufacture, offering a clear competitive advantage.

Owners

SourceSource
CompanyInterestOwnership
McLaren Minerals Ltd. 100 % Indirect
McLaren Titanium Project is 100% owned by McLaren Minerals Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Mineral sands

Summary:

The McLaren Project is underlain by units of the Precambrian Albany Fraser Orogen, with the units structurally aligned along a northeast to southwest trend. Superimposed upon this structural framework are prominent palaeo-channels, ancient drainage lines that have been in existence since the Eocene Epoch (56–39 Ma). The McLaren HM deposit is not considered as “mature” as many other HM deposits surrounding the Eucla Basin (e.g. Cyclone, Jacinth) which have undergone extensive reworking and winnowing within beach sand dune settings, thereby increasing the concentration of the HM, and conversely decreasing the volume of Slimes.

The 2025 drilling completed to support the MRE update has confirmed the McLaren deposit as being hosted within the Miocene–Eocene shoreline sands, flanked by paleo channels to the west and displaying variable surface reworking across the main deposit area. Re-interpretation of the geological domain identified a previously unrecognised lower marine unit, enhancing the depth of identified mineral bearing Marine sediments and contributing to the Resource uplift. Mineralisation dominated by ilmenite, rutile, leucoxene and zircon within the sand “Mids” fraction (38 µm – 1 mm) extends ~5 km east–west and ~8.5 km north–south.

Exhibiting strong geological continuity, the presentation of geological setting hosting the mineralising beds, is now open for further assessment allowing strike as mineral hosting sediment termination is yet to be defined. Supported by variography and drill spacing, improved geological understanding of the depositional environment has broader positive implications beyond that of the deposit area.

Dimensions
Mineralisation is modelled over a strike length of approximately 10,000 m, with a plan width of between 3,400 m and 6,500 m. Mineralisation varies in depth from the natural surface to 35m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

There are two final products:
1) Sulfate Ilmenite Concentrate.
2) Non-Magnetic Concentrate - Made up of Zircon, Rutile, Leucoxene and other minerals.
CommodityProductUnitsAvg. AnnualLOM
Ilmenite Sulphate dmt 406,950 *6,477,125 *
Zircon-Rutile Concentrate kt 0.03 *0.5 *
* According to 2025 study.

Operational metrics

Metrics
Annual processing rate  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
* According to 2025 study.

Production Costs

CommodityUnitsAverage
Assumed price Zircon-Rutile USD  ....  Subscribe
Assumed price Ilmenite USD  ....  Subscribe
* According to 2025 study / presentation.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Sustaining CapEx $M AUD  ......  Subscribe
OP OpEx $M AUD  ......  Subscribe
Processing OpEx $M AUD 621
Transportation (haulage) costs $M AUD 440
G&A costs $M AUD 166
Total OpEx $M AUD  ......  Subscribe
Royalty payments $M AUD  ......  Subscribe
Gross revenue (LOM) $M AUD  ......  Subscribe
Net revenue (LOM) $M AUD  ......  Subscribe
Operating margin (LOM) $M AUD  ......  Subscribe
EBITDA (LOM) $M AUD  ......  Subscribe
Pre-tax NPV @ 8% $M AUD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 26, 2026
....................... Subscription required ....................... Subscription required Subscription required Jan 26, 2026

Workforce

Aerial view:

Lock

- subscription is required.